Final | 10/16/2005 | 10/17/2005 | 10/18/2005 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 10/16/2005 at 8:31:38 PM. Contact: ###-####.
|
Plumbing Rough-in | 9/12/2005 | 9/12/2005 | 9/12/2005 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 9/12/2005 at 7:29:16 AM. Contact: ###-####.
|
Groundwork | 9/1/2005 | 9/2/2005 | 9/2/2005 | A | PASS |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 9/1/2005 at 1:53:22 PM. Contact: ###-####. G/W and waste and vent ok. ds
|