Final | 12/30/2005 | 1/3/2006 | 1/3/2006 | A | PASS |
Bill VanDegrift
|
|
|
JT Waters is the contact ; Phone #: ###-#### Internet Inspection Request from: Samantha Patterson final ok with t&p drain piped to the floor instead of the pan.
|
Plumbing Rough-in | 11/8/2005 | 11/8/2005 | 11/8/2005 | P | PASS |
Bill VanDegrift
|
|
|
Contact is JT Waters; Phone #: ###-#### Internet Inspection Request from: Samantha Patterson ri ok
|
Plumbing Rough-in | 11/4/2005 | 11/7/2005 | 11/7/2005 | A | FAIL |
Bill VanDegrift
|
|
|
Contact is Rod Bacus; Phone #: ###-#### Internet Inspection Request from: Samantha Patterson complete nail plating,and water softenor flush line. ri soft water to the kitchen sink. secure hose bibs, roughed in above the floor, to a dropear fitting.
|