Final | 2/28/2006 | 2/28/2006 | 2/28/2006 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 2/28/2006 at 11:30:20 AM. Contact: ###-####.
|
Final | 2/27/2006 | 2/27/2006 | 2/27/2006 | P | DONE |
|
|
|
2-27-06 PM insp per Koudelka Plumbing OK'd by Jim Johnson 2-27-06 eus
|
Final | 2/23/2006 | 2/24/2006 | 2/24/2006 | A | PART |
Jim Johnson
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa need to have ice and soda machine installed for final contractor to call when ready oked temp
|
Final | 2/22/2006 | 2/22/2006 | 2/23/2006 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 2/22/2006 at 8:51:43 AM. Contact: ###-####. need expansion tank installed on water heater need to provide identification tag,s for RP in counter in frount of store need to provide 120 degree hot water limitation to public laves called contractor will recall when ready
|
Plumbing Rough-in | 1/9/2006 | 1/9/2006 | 1/9/2006 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/9/2006 at 10:37:05 AM. Contact: ###-####.
|
Plumbing Rough-in | 1/6/2006 | 1/6/2006 | 1/6/2006 | P | FAIL |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/6/2006 at 8:44:23 AM. Contact: ###-####. test failed on DWV system need to retest 2. need tosupport horizontal drain lines on roof and overflow drain,s note - water system test ok roof and overflow drains test ok
|
Groundwork | 11/14/2005 | 11/14/2005 | 11/14/2005 | P | PASS |
Jim Johnson
|
|
|
joe ###-####
|