Final | 8/7/2006 | 8/8/2006 | 8/8/2006 | A | PASS |
Daryl Spivey
|
|
|
dennis ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
PLM-Aging Inspection | 6/26/2006 | 6/26/2006 | 6/26/2006 | | NR |
Gerry Varner
|
|
|
|
Final | 4/25/2006 | 4/25/2006 | 4/25/2006 | P | PART |
Bill VanDegrift
|
|
|
temp occ ok no card on site, just needs to set the breakroom sink.
|
Final | 4/19/2006 | 4/21/2006 | 4/21/2006 | P | FAIL |
Bill VanDegrift
|
|
|
###-#### - dennis vacuum breaker required at the mop sink, remove the hose bib upstream of the dcva. calk mop sink. seal penatrations at the sewer and water services, set all fixtures. remove hose bib prior to temp occ.
|
PLM-Aging Inspection | 3/16/2006 | 3/16/2006 | 3/16/2006 | | PASS |
Gary Ziegler
|
|
|
|
Plumbing Rough-in | 1/4/2006 | 1/4/2006 | 1/5/2006 | P | PASS |
Gary Ziegler
|
|
|
rod; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
Plumbing Rough-in | 1/3/2006 | 1/3/2006 | 1/3/2006 | P | FAIL |
Gary Ziegler
|
|
|
rod; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Groundwork | 11/21/2005 | 11/21/2005 | 11/21/2005 | P | PASS |
Gary Ziegler
|
|
|
dennis cell ###-#### call 1st for access
|