Final | 4/23/2008 | 4/24/2008 | 4/24/2008 | A | PASS |
Jim Johnson
|
|
|
|
Final | 4/22/2008 | 4/23/2008 | 4/23/2008 | P | CANC |
Jim Johnson
|
|
|
victor Phone #: ###-####
|
PLM-Aging Inspection | 3/20/2008 | 3/20/2008 | 3/20/2008 | | PASS |
Jim Johnson
|
|
|
|
Final | 1/14/2008 | 1/15/2008 | 1/15/2008 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/14/2008 at 4:25:54 PM. walked ninth floor with victov from RM oed temp
|
Final | 12/12/2007 | 12/12/2007 | 12/12/2007 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/12/2007 at 5:54:15 AM. Contact: ###-####. oked temp. 8th floor only
|
Final | 11/6/2007 | 11/6/2007 | 11/6/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 11/6/2007 at 7:34:16 AM. Contact: ###-####. oked temp for fourth and fifth floor central tower
|
Final | 10/23/2007 | 10/24/2007 | 10/24/2007 | A | CANC |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 10/23/2007 at 12:46:28 PM. Contact: ###-####.
|
Med/Gas Systems | 10/22/2007 | 10/23/2007 | 10/23/2007 | A | PART |
Jim Johnson
|
|
|
24 hr pressure test on med gas on second floor test ok
|
Med/Gas Systems | 10/22/2007 | 10/22/2007 | 10/22/2007 | A | CANC |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 10/22/2007 at 7:22:50 AM. Contact: ###-####. start of 24 hr. pressure test 2nd floor
|
Med/Gas Systems | 10/17/2007 | 10/18/2007 | 10/18/2007 | P | PART |
Jim Johnson
|
|
|
24 hr pressure test on second floor test ok note oked temp for penthouse
|
Med/Gas Systems | 10/17/2007 | 10/17/2007 | 10/17/2007 | P | CANC |
Jim Johnson
|
|
|
|
Med/Gas Systems | 10/16/2007 | 10/17/2007 | 10/17/2007 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 10/16/2007 at 4:07:56 PM. Contact: ###-####. start of 24 hr pressure test on second floor in central tower to medical equipment room
|
Final | 10/15/2007 | 10/15/2007 | 10/15/2007 | A | PART |
Eric Strole
|
|
|
temp final ok on floors 6 & 7, these floors are unfinished. a 3" flr drain is required on emergency shower & eyewash in penthouse per upc 801.6.
|
Final | 10/9/2007 | 10/10/2007 | 10/10/2007 | A | PART |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 10/9/2007 at 2:03:08 PM. Contact: ###-####. 1,2,3,floors ok temp. 4,5,floor ok furnishings only. floor 6&7 up to Eric. no drain for emergence shower and eye wash so I wouldnot give temp 0n penthouse.
|
Plumbing Rough-in | 9/18/2007 | 9/19/2007 | 9/19/2007 | P | PASS |
Eric Strole
|
|
|
under flr dwv for 8th flr in rooms 87110,12,13,14,18,15,16 pass, this completes rough-in of 8th flr. this is the complete rough-in of dwv & water of the central tower.
|
Plumbing Rough-in | 9/18/2007 | 9/18/2007 | 9/18/2007 | P | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 9/18/2007 at 9:33:09 AM. Contact: ###-####.-under flr dwv for 8th flr in rooms 87208,09,10,11,07,06,13 pass.
|
Plumbing Rough-in | 9/17/2007 | 9/17/2007 | 9/17/2007 | P | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 9/17/2007 at 10:52:52 AM. -under flr dwv for 8th flr in rooms 87608,09,06,05,02,01,04,03 pass
|
Plumbing Rough-in | 9/13/2007 | 9/13/2007 | 9/13/2007 | P | PASS |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 9/13/2007 at 9:09:18 AM. Contact: ###-####.under flr dwv for 8yh flr in rooms 87206,04,03,05 pass.
|
Other | 9/11/2007 | 9/11/2007 | 9/11/2007 | A | PART |
Jim Johnson
|
|
|
conf. on backflow devices
|
Final | 9/10/2007 | 9/11/2007 | 9/11/2007 | A | DONE |
Eric Strole
|
|
|
this was a conferance.
|
Plumbing Rough-in | 9/10/2007 | 9/10/2007 | 9/10/2007 | P | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 9/10/2007 at 7:59:54 AM. Contact: ###-####.-under flr dwv for 8th flr in rooms 87201, 02,87002,04,03,01,05,06,07,08 pass.
|
Med/Gas Systems | 8/30/2007 | 8/30/2007 | 8/30/2007 | P | PART |
Eric Strole
|
|
|
med vac & oxygen test pass.
|
Med/Gas Systems | 8/30/2007 | 8/30/2007 | 8/30/2007 | A | CANC |
Eric Strole
|
|
|
|
Med/Gas Systems | 8/29/2007 | 8/30/2007 | 8/30/2007 | A | CANC |
Eric Strole
|
|
|
|
Med/Gas Systems | 8/29/2007 | 8/29/2007 | 8/29/2007 | P | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 8/29/2007 at 8:15:34 AM. Contact: ###-####.-this is the start of 24hr test on vac & oxygen on 9th flr .
|
Plumbing Rough-in | 8/27/2007 | 8/27/2007 | 8/27/2007 | P | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 8/27/2007 at 10:22:48 AM. Contact: ###-####.-under flr dwv for 8th flr in rooms 87106,05,03,04,02,01,87007,08,06,05 pass.
|
Plumbing Rough-in | 8/23/2007 | 8/23/2007 | 8/23/2007 | A | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 8/23/2007 at 6:41:56 AM. Contact: ###-####.-under flr dwv for 8th flr in rooms 87616,17,18,23,20,25 pass.
|
Roof Drains | 8/22/2007 | 8/22/2007 | 8/22/2007 | A | CANC |
Eric Strole
|
|
|
|
Storm Drains | 8/21/2007 | 8/22/2007 | 8/22/2007 | A | CANC |
Eric Strole
|
|
|
|
Plumbing Rough-in | 8/21/2007 | 8/21/2007 | 8/21/2007 | A | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 8/21/2007 at 6:19:35 AM. Contact: ###-####.-dwv under flr for 8th flr for rooms 87121,22,20,18,08,06,07,19,17,09 pass.
|
Plumbing Rough-in | 8/14/2007 | 8/15/2007 | 8/15/2007 | A | PART |
Eric Strole
|
|
|
under flr dwv for 8th flr in rooms 87312,13,05,09,15 pass
|
Plumbing Rough-in | 8/14/2007 | 8/15/2007 | 8/14/2007 | P | CANC |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 8/14/2007 at 11:42:51 AM. Contact: ###-####.
|
Plumbing Rough-in | 8/13/2007 | 8/13/2007 | 8/13/2007 | P | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 8/13/2007 at 11:16:26 AM. Contact: ###-####.under flr dwv for 9th flr in rooms 87629,28,30,31,32,87401,02,87317,16 pass.
|
Plumbing Rough-in | 8/7/2007 | 8/7/2007 | 8/7/2007 | P | NR |
Eric Strole
|
|
|
|
Plumbing Rough-in | 8/6/2007 | 8/6/2007 | 8/6/2007 | P | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 8/6/2007 at 11:09:58 AM. Contact: ###-####.dwv for under flr of 9th flr for rooms 87702, 87614 pass.
|
Med/Gas Systems | 8/1/2007 | 8/2/2007 | 8/2/2007 | P | PART |
Eric Strole
|
|
|
room 28005 final pressure test on med gas pass.
|
Plumbing Rough-in | 8/1/2007 | 8/2/2007 | 8/2/2007 | P | PART |
Eric Strole
|
|
|
dwv under flr for 9th flr in rooms 87707,08,04,05,06,07 pass.
|
Med/Gas Systems | 8/1/2007 | 8/1/2007 | 8/1/2007 | P | PART |
Eric Strole
|
|
|
2nd flr room 28005 start 24 hr test on 5 med gas boxes, test at 150 psi.
|
Plumbing Rough-in | 7/31/2007 | 8/1/2007 | 8/1/2007 | P | PART |
Eric Strole
|
|
|
8th flr under flr rough-in of dwv in rooms 87901,02,03,04,87612,11 pass.
|
Plumbing Rough-in | 7/31/2007 | 7/31/2007 | 7/31/2007 | P | PART |
Eric Strole
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang-needs to ajust grade on dwv on 7th flr overhead for 8th flr bathroom groups.
|
Plumbing Rough-in | 7/30/2007 | 7/30/2007 | 7/30/2007 | P | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 7/30/2007 at 10:02:57 AM. Contact: ###-####.9th flr dwv & water rough-in complete, pass.
|
Plumbing Rough-in | 7/25/2007 | 7/25/2007 | 7/25/2007 | P | CANC |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 7/25/2007 | 7/25/2007 | 7/25/2007 | P | CANC |
Eric Strole
|
|
|
|
Plumbing Rough-in | 7/23/2007 | 7/24/2007 | 7/24/2007 | A | PART |
Eric Strole
|
|
|
9th flr water in walls in rooms 97218,97114,13,12,16,10.
|
Plumbing Rough-in | 7/23/2007 | 7/23/2007 | 7/23/2007 | P | CANC |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 7/23/2007 at 11:02:32 AM. Contact: ###-####.
|
Plumbing Rough-in | 7/18/2007 | 7/19/2007 | 7/19/2007 | P | PART |
Eric Strole
|
|
|
water in walls on 9th flr in rooms 97102,05,06,04 & n.p.d. box west end pass.
|
Final | 7/18/2007 | 7/19/2007 | 7/19/2007 | A | PART |
Eric Strole
|
|
|
ok temp final for equipment to be moved into basement, 1st, 2nd, 3rd, 6th, 7th & penthouse-item's that still need corrected are marked on correction notice.
|
Other | 7/18/2007 | 7/18/2007 | 7/18/2007 | A | DONE |
Eric Strole
|
|
|
this was to write correction notice and bring to dennis with rm mech.
|
Plumbing Rough-in | 7/16/2007 | 7/17/2007 | 7/17/2007 | P | PART |
Eric Strole
|
|
|
9th flr water in walls in rooms 97103,97003,04,02,01 pass
|
Plumbing Rough-in | 7/16/2007 | 7/16/2007 | 7/16/2007 | P | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 7/16/2007 at 10:31:54 AM. Contact: ###-####.9th flr water in walls in rooms 97202,97005,06,08,07,01 pass.
|
Final | 7/11/2007 | 7/11/2007 | 7/11/2007 | A | PART |
Jim Johnson
|
|
|
made walk through with dennis from R.M. and Bill T. with united water for basement , first floor, 2nd floor and third floor made list of correction need to be made
|
Final | 7/10/2007 | 7/10/2007 | 7/11/2007 | A | DONE |
Eric Strole
|
|
|
this was a walk thru with jim johnson ,dennis with rm & bill thomson. see jims notes.
|
Plumbing Rough-in | 7/10/2007 | 7/10/2007 | 7/10/2007 | P | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 7/10/2007 at 10:00:03 AM. Contact: ###-####.9th flr water in walls in rooms 97208,09,07,06,05,04,06
|
Plumbing Rough-in | 7/2/2007 | 7/3/2007 | 7/3/2007 | P | CANC |
Eric Strole
|
|
|
|
Med/Gas Systems | 7/2/2007 | 7/3/2007 | 7/3/2007 | P | PART |
Eric Strole
|
|
|
9th flr west end med air,vav & oxygen pass.
|
Med/Gas Systems | 7/2/2007 | 7/2/2007 | 7/2/2007 | P | PART |
Eric Strole
|
|
|
this is the start of 24 hr test on 9th flr, west end on med vac,air & oxygen.
|
Plumbing Rough-in | 6/28/2007 | 7/2/2007 | 7/2/2007 | P | PART |
Eric Strole
|
|
|
9th flr dwv in rooms 97110,12,16,13,14,97218, & p.h. flr sinks pass. this completes dwv on 9th flr. .9th flr water in wall in rooms 97212a,97210,11,97322 pass.
|
Plumbing Rough-in | 6/28/2007 | 6/28/2007 | 6/28/2007 | P | CANC |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 6/28/2007 at 11:04:28 AM. Contact: ###-####.
|
Plumbing Rough-in | 6/26/2007 | 6/26/2007 | 6/26/2007 | P | PART |
Eric Strole
|
|
|
dwv on 9th flr in rooms 97202,01,97001,02,04,03,05 pass
|
Plumbing Rough-in | 6/25/2007 | 6/25/2007 | 6/25/2007 | P | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 6/25/2007 at 9:49:22 AM. Contact: ###-####.dwv 9th flr in rooms 97106,05,03,04,02,01,97008,07,06,05 pass. water in walls 9th fl in rooms 97109,07,06 pass
|
Plumbing Rough-in | 6/20/2007 | 6/20/2007 | 6/20/2007 | A | PART |
Eric Strole
|
|
|
9th flr water in walls in rooms 97121,22,20,19,18,17 pass
|
Med/Gas Systems | 6/19/2007 | 6/20/2007 | 6/20/2007 | A | PART |
Eric Strole
|
|
|
med vacuum north tower boiler room pass 24 hr test.
|
Med/Gas Systems | 6/18/2007 | 6/19/2007 | 6/19/2007 | A | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 6/18/2007 at 4:09:10 PM. Contact: ###-####.start 24 hr test on 4" vacuum line in boiler room north tower.
|
Plumbing Rough-in | 6/18/2007 | 6/19/2007 | 6/19/2007 | A | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 6/18/2007 at 4:07:56 PM. Contact: ###-####.9th flr water in walls in rooms 97315,11,10,09,08,05,06 pass.
|
Plumbing Rough-in | 6/18/2007 | 6/18/2007 | 6/19/2007 | P | CANC |
Eric Strole
|
|
|
8 ish
|
Plumbing Rough-in | 6/14/2007 | 6/18/2007 | 6/18/2007 | P | CANC |
Bill VanDegrift
|
|
|
rescheduled for tomarrow am no time
|
Plumbing Rough-in | 6/14/2007 | 6/14/2007 | 6/14/2007 | P | CANC |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 6/14/2007 at 10:22:52 AM. Contact: ###-####.
|
Plumbing Rough-in | 6/11/2007 | 6/11/2007 | 6/11/2007 | P | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 6/11/2007 at 11:13:58 AM. Contact: ###-####.-dwv 9th flr in rooms 97212a,97210,11,08,09,07,06,03,05,04 pass.water in walls 9th flr in rooms 97625,97316,97402,97632 pass.
|
Plumbing Rough-in | 6/7/2007 | 6/7/2007 | 6/7/2007 | P | PASS |
Eric Strole
|
|
|
water in walls on 9th flr in rooms 97630,34 pass. dwv 9th flr in rooms 97122,19,20,17,18,08,09,07 pass.
|
Plumbing Rough-in | 6/6/2007 | 6/7/2007 | 6/7/2007 | A | CANC |
Eric Strole
|
|
|
|
Med/Gas Systems | 6/7/2007 | 6/7/2007 | 6/7/2007 | A | PART |
Eric Strole
|
|
|
this was time on last inspection.
|
Med/Gas Systems | 6/6/2007 | 6/7/2007 | 6/7/2007 | A | PART |
Eric Strole
|
|
|
med air,oxygen & vacuum pass per inspection that was started on 6-6-07.
|
Med/Gas Systems | 6/6/2007 | 6/6/2007 | 6/6/2007 | P | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 6/6/2007 at 10:22:34 AM. Contact: ###-####.2nd flr south tower east end med air, vacuum & oxygen on upstream side to valve box on 1st flr start 24 hr test.
|
Plumbing Rough-in | 6/6/2007 | 6/6/2007 | 6/6/2007 | P | PART |
Eric Strole
|
|
|
9th flr dwv in rooms 97309a,97311,10,09,08,06,971613,21 pass
|
Med/Gas Systems | 6/5/2007 | 6/5/2007 | 6/5/2007 | P | PART |
Eric Strole
|
|
|
2nd flr south tower in east end med air, oxygen & vacuum test pass.
|
Plumbing Rough-in | 6/5/2007 | 6/5/2007 | 6/5/2007 | P | PART |
Eric Strole
|
|
|
9th flr dwv in rooms 97315,16,97402,03,01,97634,32,29,30,28, 31,97213 pass.9th flr water in walls in rooms 97601,02 pass
|
Plumbing Rough-in | 6/4/2007 | 6/4/2007 | 6/5/2007 | P | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 6/4/2007 at 9:58:43 AM. Contact: ###-####.9th flr water in walls in rooms 97618,23,06,04,20 pass. 9th flr dwv in rooms 97620,97618,23,24,18,25,16,17 & penthouse flr sinks.2nd flr south tower recirc line from south tower to central tower pass.this inspection was done on 6-4-07
|
Med/Gas Systems | 6/4/2007 | 6/4/2007 | 6/5/2007 | P | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 6/4/2007 at 10:00:02 AM. Contact: ###-####.start 24 hr test on med air,oxygen & vacuum on 2nd flr south tower. this was started 6-4-07.
|
Med/Gas Systems | 5/30/2007 | 5/31/2007 | 5/31/2007 | P | PART |
Eric Strole
|
|
|
9th flr east end vacuum pass. 2nd flr north tower co2 pass.
|
Plumbing Rough-in | 5/30/2007 | 5/31/2007 | 5/31/2007 | P | PART |
Eric Strole
|
|
|
9th flr south dwv in rooms 97608,07, 09,05,06,04,02,03,01 & penthouse mop sink pass.water in walls on 9th flr rooms 97628,29 pass.
|
Med/Gas Systems | 5/29/2007 | 5/30/2007 | 5/30/2007 | P | PART |
Eric Strole
|
|
|
east end on 9th flr med air & oxygen pass.-start 24 hr test on vacuum at 150 psi.-north tower 2nd flr start 24 hr test on co2 at 150 psi.
|
Plumbing Rough-in | 5/29/2007 | 5/30/2007 | 5/30/2007 | P | PASS |
Eric Strole
|
|
|
9th flr in wall water in rooms 97608,07,09,05 pass.
|
Med/Gas Systems | 5/29/2007 | 5/29/2007 | 5/29/2007 | P | PART |
Eric Strole
|
|
|
east end on 9th flr med air & oxygen at 150 psi, start 24 hr test.
|
Plumbing Rough-in | 5/29/2007 | 5/29/2007 | 5/29/2007 | P | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 5/29/2007 at 9:54:47 AM. Contact: ###-####.9th flr rooms 97701,02,97614,13,11,12,97903,02,01,04 vents pass.
|
Plumbing Rough-in | 5/24/2007 | 5/24/2007 | 5/24/2007 | P | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 5/24/2007 at 11:12:08 AM. Contact: ###-####.-9th flr rooms 97901,02,03,04,97612,11,13 wall water up to isolation valves pass.-south tower 2nd flr room nourish 21149 dwv & water pass.-north tower room anes.tech work room 27308 water piping pass.
|
Plumbing Rough-in | 5/23/2007 | 5/23/2007 | 5/23/2007 | P | PART |
Eric Strole
|
|
|
dennis ###-####-9th flr rooms 97798,07,05,06,03,04 dwv pass-rooms 97702,97614,97701,97613,97611,97612,97903,97902 water in walls pass-2nd floor rooms 21122,21,23 dwv pass-21149 underfloor dwv pass-rooms 21146,45 dwv & water pass.
|
Plumbing Rough-in | 5/21/2007 | 5/21/2007 | 5/21/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/21/2007 at 9:05:38 AM. Contact: ###-####. 8th floor water main,s in hallway and 9th floor in wall water rough-in for room,s 97703,04,05,06,07,and 08 test ok
|
Plumbing Rough-in | 5/17/2007 | 5/17/2007 | 5/17/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/17/2007 at 10:02:29 AM. Contact: ###-####. 2nd floor south tower in wall water rough-in for room,s 21122,23,34,50,and 52 test ok dwv in wall rough-in rfor room,s 21150 and 21152 test ok
|
Plumbing Rough-in | 5/14/2007 | 5/14/2007 | 5/14/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/14/2007 at 9:15:45 AM. Contact: ###-####. in wall and over head water rough-in 2nd floor south tower room # to follow on next inspection
|
Plumbing Rough-in | 5/11/2007 | 5/11/2007 | 5/11/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/11/2007 at 7:46:16 AM. Contact: ###-####. 2nd floor north tower D W V for room,s 27401,17, 18,20201,04test ok inwall water rough-in for room,s27401,17, 18,20201,and 04 test ok
|
Plumbing Rough-in | 5/10/2007 | 5/10/2007 | 5/10/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/10/2007 at 8:15:07 AM. Contact: ###-####. 9th floor bunder floor DWV for room,s 97306,08,09,10,and 11 test ok all 9th floor under floor DVW is done
|
Plumbing Rough-in | 5/9/2007 | 5/9/2007 | 5/9/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/9/2007 at 10:07:02 AM. Contact: ###-####. 2nd floor south tower med gas 24 hr pressure test ok 8th floor over head vent,s for room,s 87305,11,12, and 14 test ok
|
Plumbing Rough-in | 5/8/2007 | 5/8/2007 | 5/8/2007 | P | PART |
Jim Johnson
|
|
|
dennis - med gass; Phone #: ###-#### Internet Inspection Request from: Victoria Beall start of 24 hr. pressure test 2nd floor south tower
|
Plumbing Rough-in | 5/8/2007 | 5/8/2007 | 5/8/2007 | P | PART |
Jim Johnson
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Victoria Beall 8TH FLOOR IN WALL AND OVER HEAD VENT,S rough-in (DWV) for room,s 87110,12,13,14,16, 87213,and 18 test ok 8th floor in wall water rough-in for room,s 87003,05,06,08, 87102,10,12,13,14,16, 87213, 87309A,AND 87305 TEST OK 9th floor under floor DWV for room,s 87110,12,13,14,16, 87213, and 18 test ok note start of 24 pressure test on med gas in south tower 2nd floor
|
Plumbing Rough-in | 5/7/2007 | 5/7/2007 | 5/7/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/7/2007 at 10:47:48 AM. Contact: ###-####. 8th floor in wall DWV and over head vent,s for room,s 87001, 02,03,04,05,06,0708, 87201,and 02 test ok 8th floor in wall water rough-in for room,s 87001,02,03,04, 87201,02 test ok 9th floor under floor DWV FOR ROOM,S 97201,02,97001,02,03,04,05,06,07,08 TEST OK
|
Plumbing Rough-in | 5/3/2007 | 5/3/2007 | 5/3/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/3/2007 at 10:10:22 AM. Contact: ###-####. 9th floor under floor DWV west side of building in horse shoe area test ok
|
Med/Gas Systems | 5/2/2007 | 5/3/2007 | 5/3/2007 | P | PART |
Jim Johnson
|
|
|
south tower 2nd floor 24 hr pressure test on med gas test ok water rough-in for room,s 22001,06,11,14,17,20,23,26,27,30,31,37,41,21152,28002,and28004 test ok DWV for room,s 22030,31,34, 35, and 66 test ok
|
Med/Gas Systems | 5/2/2007 | 5/2/2007 | 5/2/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/2/2007 at 6:59:31 AM. Contact: ###-####. start of 24 hr pressure test 2nd floor south tower remodel
|
Plumbing Rough-in | 5/2/2007 | 5/2/2007 | 5/2/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/2/2007 at 6:58:15 AM. Contact: ###-####. 8th floor inwall and over head venting in horseshoe area west side of building dennis to provide room # on next inspection test ok
|
Plumbing Rough-in | 5/1/2007 | 5/1/2007 | 5/1/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/1/2007 at 10:04:01 AM. Contact: ###-####. 8th floor vent piping for room,s 87102,03,04,05,06, test ok 9th floor under floor DWV for room,s 97101,02,03,04,05,06, test ok
|
Plumbing Rough-in | 4/30/2007 | 4/30/2007 | 4/30/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/30/2007 at 9:45:23 AM. Contact: ###-####. 8th floor in wall water for room,s 87103,04,05,and 06 test ok
|
Plumbing Rough-in | 4/26/2007 | 4/26/2007 | 4/26/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/26/2007 at 10:30:07 AM. Contact: ###-####. 9th floor under floor DWV for room,s 97204,05,06,07,08,09,10,11,and 12-A test ok 8th floor in wall water rough-in for room,s 87110, 12, 14, 15, 16, 18, 87203,04,05,and 08 test ok 2nd floor south tower DWV for toilet room for asu 6&7 room #22011 and toilet room for asu 8&9 room # 22013 and janitor closet room #22013 test ok walked water main,s & branch water run,s with Lane he will provide room # on next inspection water lines test ok that were inspected
|
Plumbing Rough-in | 4/25/2007 | 4/25/2007 | 4/26/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/25/2007 at 9:59:43 AM. Contact: ###-####. 8th floor dwv and over head venting for room,s 87107,08,09,17,18,19,20,22,and 24 test ok . 2nd floor south tower remodel dwv and over head venting for room,s 22100,22101,22017,20,23,and 26, 0k
|
Med/Gas Systems | 4/24/2007 | 4/24/2007 | 4/24/2007 | P | PART |
Jim Johnson
|
|
|
24 hr pressure test on up stream piping from zone valves test ok 8th floor
|
Plumbing Rough-in | 4/24/2007 | 4/24/2007 | 4/24/2007 | P | PART |
Jim Johnson
|
|
|
8th floor water rough-in for room,s 87206,08,10and 12A and room 89108 test ok 8th floor in wall DWV and vent ing for room,s 87203,04,05,06,07,08,09,10,11,and 12A test ok
|
Med/Gas Systems | 4/23/2007 | 4/23/2007 | 4/23/2007 | P | CANC |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/23/2007 at 7:20:29 AM. Contact: ###-####. retesting pressure test on 8th floor up stream side of zone valves 24 hr test
|
Plumbing Rough-in | 4/23/2007 | 4/23/2007 | 4/23/2007 | P | CANC |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/23/2007 at 7:19:12 AM. Contact: ###-####. 9th floor under floor DWV for room,s 97107,08,09,17,18,19,20,22,and 24 test ok 8th floor in wall water rough-in for room,s 87107,09,17,18,20,and 22 test ok
|
Med/Gas Systems | 4/19/2007 | 4/20/2007 | 4/20/2007 | P | PART |
Jim Johnson
|
|
|
24 hr pressure test for 8th floor up-stream piping from west and east zone valves for med- air and oxygen failed air down to 144 psi and oxygen down to 125 psi will need to retest. vac line tested ok
|
Med/Gas Systems | 4/19/2007 | 4/19/2007 | 4/19/2007 | P | CANC |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/19/2007 at 8:29:38 AM. Contact: ###-####. start of 24 hr pressure test 8th floor up stream of zone valve on west side and pipinig up to up stream side of zone valve on east side
|
Plumbing Rough-in | 4/19/2007 | 4/19/2007 | 4/19/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/19/2007 at 8:28:19 AM. Contact: ###-####. 9th floor under floor waste and drains for room,s 97601,02,03,04,05,06,07,08,and09 room,s 97401,02and03, room,s97628,29,and 30, test ok
|
Med/Gas Systems | 4/17/2007 | 4/18/2007 | 4/18/2007 | P | PART |
Jim Johnson
|
|
|
end of 24 hr. pressure test on piping down stream of zone valve test ok on 8th floor
|
Med/Gas Systems | 4/17/2007 | 4/17/2007 | 4/17/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/17/2007 at 8:24:30 AM. Contact: ###-####. start of 24 hr pressure test down stream of zone valves 8th floor
|
Plumbing Rough-in | 4/17/2007 | 4/17/2007 | 4/17/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/17/2007 at 8:23:12 AM. Contact: ###-####. 8th floor in wall water rough-in for room,s 87312,13,15,and 87119,and21 test ok pent house water roughin test ok 9th floor under floor DWV for room,s 97703,04,05,06,07,08, 97601,02,03,12,14,and 97804 test ok
|
Med/Gas Systems | 4/16/2007 | 4/17/2007 | 4/17/2007 | A | NR |
Jim Johnson
|
|
|
|
Med/Gas Systems | 4/16/2007 | 4/16/2007 | 4/16/2007 | P | NR |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/16/2007 at 8:52:36 AM. Contact: ###-####. not ready on 8th floor
|
Plumbing Rough-in | 4/16/2007 | 4/16/2007 | 4/16/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/16/2007 at 8:51:19 AM. Contact: ###-####. in wall water rough-in in room,s where outside elevator use to be on 4th and 5th floor test ok
|
Plumbing Rough-in | 4/11/2007 | 4/11/2007 | 4/12/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/11/2007 at 8:45:08 AM. Contact: ###-####. all of 6th under floor DWV piping completed and test ok. 5th floor hot and cold water main,s test ok
|
Plumbing Rough-in | 4/9/2007 | 4/10/2007 | 4/10/2007 | P | PART |
Jim Johnson
|
|
|
6th floor under floor DWV center section test ok
|
Plumbing Rough-in | 4/9/2007 | 4/9/2007 | 4/9/2007 | P | NR |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/9/2007 at 10:17:40 AM. Contact: ###-####. not ready
|
Plumbing Rough-in | 4/5/2007 | 4/5/2007 | 4/5/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/5/2007 at 9:27:07 AM. Contact: ###-####. 6th floor under floor DWV piping west side of building
|
Plumbing Rough-in | 4/4/2007 | 4/4/2007 | 4/4/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/4/2007 at 7:54:34 AM. Contact: ###-####. 8th floor in wall DWV and overhead vent,s for room,s 87108, 09,16,17,18,19,20,and 21, 87203, 04,05,06,07,08,09,and 11. test ok 6th floor under floor DWV for north west portion of building test ok
|
Plumbing Rough-in | 4/2/2007 | 4/3/2007 | 4/3/2007 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/2/2007 at 11:31:58 AM. 6th floor under floor DWV rough-in on south east , east , and north east side of building
|
Plumbing Rough-in | 3/30/2007 | 3/30/2007 | 3/30/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/30/2007 at 9:37:04 AM. Contact: ###-####. under floor dwv piping for room,s 97616,17,18,19,20,24, and 25 test ok in wall water rough -in for 8th floor room,s 87602,16,17,18,19,20,24, and 25 test ok
|
Plumbing Rough-in | 3/29/2007 | 3/29/2007 | 3/29/2007 | P | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 3/29/2007 at 10:04:12 AM. Contact: ###-####.-vents on 8th flr in rooms 87616, 87617, 87618, 87625, 87624, 87619, 87620 pass. water in walls on 8th flr in rooms 87628, 87629, 87630, 87631, 87632, 87402 pass.
|
Plumbing Rough-in | 3/28/2007 | 3/28/2007 | 3/28/2007 | P | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 3/28/2007 at 10:24:57 AM. Contact: ###-####.section of under floor of 6th floor dwv ok, section marked on plans.
|
Plumbing Rough-in | 3/26/2007 | 3/26/2007 | 3/26/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/26/2007 at 9:43:53 AM. Contact: ###-####.8th floor DWV for room,s87609,and 87700 test ok 8th floor in wall water rough-in for room,s 87603,04,05,06,07,08, and 09 test ok
|
Plumbing Rough-in | 3/23/2007 | 3/23/2007 | 3/23/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/23/2007 at 4:44:31 AM. Contact: ###-####. need to correct leak in DWV on east side of building on 8th floor
|
Plumbing Rough-in | 3/22/2007 | 3/22/2007 | 3/22/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/22/2007 at 8:21:24 AM. Contact: ###-####. DWV vent,s 5th floor for room,s 57110,12,13,14,15,16, and 57219 test ok
|
Med/Gas Systems | 3/20/2007 | 3/21/2007 | 3/21/2007 | P | PART |
Jim Johnson
|
|
|
24 hr pressure test ok for piping down stream of zone valves still need to test up stream piping
|
Plumbing Rough-in | 3/20/2007 | 3/21/2007 | 3/21/2007 | A | PART |
Jim Johnson
|
|
|
in wall water rough-in for 8th floor for room,s 87701and 03 and 87609 test ok
|
Med/Gas Systems | 3/20/2007 | 3/20/2007 | 3/20/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/20/2007 at 8:59:54 AM. Contact: ###-####. start of 24 hr. pressure test down stream of zone valves 8th floor
|
Plumbing Rough-in | 3/20/2007 | 3/20/2007 | 3/20/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/20/2007 at 8:58:37 AM. Contact: ###-####. 8th floor in wall water rough-in for room,s 87609, 11, and 87703 test ok
|
Plumbing Rough-in | 3/19/2007 | 3/19/2007 | 3/19/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/19/2007 at 9:45:34 AM. Contact: ###-####. 8th floor dwv vent ,s for room,s 87703,04,05,06,07, and 08 and87601,02,03,04,11,and 12 test ok
|
Med/Gas Systems | 3/15/2007 | 3/15/2007 | 3/15/2007 | P | NR |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/15/2007 at 9:14:23 AM. Contact: ###-####. 8th floor med gas not ready for inspection
|
Plumbing Rough-in | 3/15/2007 | 3/15/2007 | 3/15/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/15/2007 at 9:13:04 AM. Contact: ###-####. 8th floor in wall water rough-in for room,s 87902 and 04, and 87612 test ok
|
Plumbing Rough-in | 3/14/2007 | 3/14/2007 | 3/14/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/14/2007 at 6:20:31 AM. Contact: ###-####. 5th floor DWV vent,s for room,s 57001,02,03,04,05,06,07,08,57201,02, 57101,02,03,04,05,and 06 test ok. 8th floor water in wall rough-in for room,s 87702,03,04,05,06,07,08,and room 87614 test ok
|
Med/Gas Systems | 3/13/2007 | 3/14/2007 | 3/14/2007 | A | PART |
Jim Johnson
|
|
|
air and oxygen24 hr pressure test ok . test failed on vacuum line on second floor south side of building need to correct leak and retest contractor to recall when ready
|
Med/Gas Systems | 3/12/2007 | 3/13/2007 | 3/13/2007 | A | PART |
Jim Johnson
|
|
|
start of 24hr pressure test 2nd floor
|
Med/Gas Systems | 3/12/2007 | 3/12/2007 | 3/12/2007 | P | CANC |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/12/2007 at 5:54:45 AM. Contact: ###-####. canc not ready
|
Plumbing Rough-in | 3/8/2007 | 3/9/2007 | 3/9/2007 | A | PART |
Jim Johnson
|
|
|
small portion of DWV (vent system ) in north west side of building test ok on 5th floor
|
Plumbing Rough-in | 3/8/2007 | 3/8/2007 | 3/8/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/8/2007 at 10:06:42 AM. Contact: ###-####. 5th floor DWV (vent,s ) for room,s 57107,08,09,17,18,19,20,21,and22 test ok
|
Plumbing Rough-in | 3/7/2007 | 3/7/2007 | 3/7/2007 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/7/2007 at 6:08:17 AM. Contact: ###-####. 5th floor vent,s for room,s 57204,05,06,07,08,09,10,and 11 test ok
|
Plumbing Rough-in | 3/6/2007 | 3/6/2007 | 3/6/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/6/2007 at 8:36:28 AM. Contact: ###-####. dwv 5th floor for room,s 57305a,09,12,13,14,and 15 test ok
|
Plumbing Rough-in | 3/2/2007 | 3/2/2007 | 3/2/2007 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/2/2007 at 6:11:40 AM. Contact: ###-####. 5th floor in wall water rough-in for room,s 57110,12,15,16,and 17 test ok 5th floor DWV for room,s 57316,and 17, 57401,02, and 03, 57628,29,30,31,and 32 test ok
|
Plumbing Rough-in | 2/28/2007 | 2/28/2007 | 2/28/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 2/28/2007 at 10:50:03 AM. Contact: ###-####. in wall water rough-in 5th floor for room,s 57201, and 57202
|
Plumbing Rough-in | 2/27/2007 | 2/27/2007 | 2/27/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 2/27/2007 at 5:54:36 AM. Contact: ###-####. in wall water rough-in 5th floor for room,s 57001 02,03,04,05,06,07,and 08 and portion of 6th under floor dwv noted and dated in main job trailer
|
Plumbing Rough-in | 2/22/2007 | 2/23/2007 | 2/23/2007 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 2/22/2007 at 3:46:06 PM. Contact: ###-####. in wall water rough-in 5th floor for room,s 57101,57203,04,57113,14 . 5th floor under floor DWV for room,s 57001,02,03,04,05,06,07,08,57101,02,03,04,05,06, 57201 and 02 test ok
|
Plumbing Rough-in | 2/22/2007 | 2/22/2007 | 2/22/2007 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 2/22/2007 at 5:50:35 AM. Contact: ###-####. 5th floor under floor DWV for room,s 57210,14,16,17, 57203,04,06,07,08,and 09 test ok in wall water rough-in 5th floor for room 57315 test ok
|
Plumbing Rough-in | 2/20/2007 | 2/20/2007 | 2/21/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 2/20/2007 at 10:56:32 AM. Contact: ###-####. 5th floor under floor DWV piping for room,s 57106,09,16,17,19,20,21,and 22 test ok
|
Plumbing Rough-in | 2/16/2007 | 2/16/2007 | 2/16/2007 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 2/16/2007 at 6:16:31 AM. Contact: ###-####.in wall water rough-in 5th floor for room,s 57103,04,05,and 06
|
Plumbing Rough-in | 2/14/2007 | 2/15/2007 | 2/15/2007 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 2/14/2007 at 4:25:35 PM. Contact: ###-####. in wall water rough-in 5th floor for room,s 57313,12,09,57107,17,18,19,20,21,and22 test ok
|
Plumbing Rough-in | 2/13/2007 | 2/14/2007 | 2/14/2007 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 2/13/2007 at 3:02:27 PM. Contact: ###-####. in wall water rough-in on north side of building 5th floor
|
Plumbing Rough-in | 2/7/2007 | 2/7/2007 | 2/8/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 2/7/2007 at 11:26:47 AM. Contact: ###-####. DWV venting for 5th floor room,s 57601,02,03,04,05,06,07,08,09 test ok
|
Plumbing Rough-in | 2/5/2007 | 2/6/2007 | 2/6/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 2/5/2007 at 11:40:10 AM. Contact: ###-####. in wall water rough-in 5th floor for room,s 57501, 57206,07,09,10,11,and 17 test ok
|
Plumbing Rough-in | 2/1/2007 | 2/1/2007 | 2/1/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 2/1/2007 at 10:48:50 AM. Contact: ###-####. vent rough-in on 5th floor for room,s 57617,19,15, 24,and 25 test ok
|
Plumbing Rough-in | 1/30/2007 | 1/30/2007 | 1/30/2007 | P | PART |
Jim Johnson
|
|
|
water main,s 4th floor test ok
|
Plumbing Rough-in | 1/30/2007 | 1/30/2007 | 1/30/2007 | P | PART |
Jim Johnson
|
|
|
in wall water rough-in 5th floor for room,s 57401,02, 57312,16, 57628,29,30,31,and 32 test ok
|
Med/Gas Systems | 1/29/2007 | 1/30/2007 | 1/30/2007 | P | PASS |
Jim Johnson
|
|
|
24 hr pressure test 5th floor test ok
|
Plumbing Rough-in | 1/29/2007 | 1/29/2007 | 1/29/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/29/2007 at 6:12:22 AM. Contact: ###-####. in wall water 5th floor north east side
|
Med/Gas Systems | 1/29/2007 | 1/29/2007 | 1/29/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/29/2007 at 6:11:22 AM. Contact: ###-####. start of 24 hr. pressure test 5th floor south west side of building
|
Plumbing Rough-in | 1/25/2007 | 1/25/2007 | 1/25/2007 | P | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 1/25/2007 at 11:00:03 AM. Contact: ###-####.-wall rough-in for water on 5th flr in rooms 57601, 57602, 57603, 57604, 57605 pass.
|
Med/Gas Systems | 1/23/2007 | 1/24/2007 | 1/24/2007 | P | PART |
Jim Johnson
|
|
|
24 hr pressure test for third floor test ok
|
Plumbing Rough-in | 1/24/2007 | 1/24/2007 | 1/24/2007 | P | PART |
Jim Johnson
|
|
|
test for vent,s on 5th floor for room,s57901,02,03,04, 57701,02,57611,12,13,and 14 test ok
|
Plumbing Rough-in | 1/23/2007 | 1/23/2007 | 1/23/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/23/2007 at 7:42:11 AM. Contact: ###-####. 5th floor vent,s for room,s57703,04,05,06,07,08 test ok 5th floor water in wall rough-in for room,s57616,17,19,20,24,and 25 test ok
|
Med/Gas Systems | 1/23/2007 | 1/23/2007 | 1/23/2007 | P | PART |
Jim Johnson
|
|
|
start of 24 hr. pressure test on 3rd floor down stream of zone valves on north west side of building
|
Plumbing Rough-in | 1/22/2007 | 1/22/2007 | 1/22/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/22/2007 at 7:00:30 AM. Contact: ###-####. 5th floor in wall water rough-in for room,s 57901.02.03,04 57605,08,09,11,and 57612 test ok
|
Plumbing Rough-in | 1/18/2007 | 1/18/2007 | 1/18/2007 | P | PART |
Jim Johnson
|
|
|
under floor dwv piping for 5th floor for rooms 57601,02,03,04,05,06,08,and 09 test ok in wall water rough-in for rooms on 5th floor 57701, 02,03,04,05,06,07,08,and 57614 test ok
|
Med/Gas Systems | 1/17/2007 | 1/18/2007 | 1/18/2007 | P | PART |
Jim Johnson
|
|
|
24 hr pressure test on piping down stream of zone valves test ok on 5th floor med gas system
|
Med/Gas Systems | 1/17/2007 | 1/17/2007 | 1/17/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/17/2007 at 10:50:36 AM. Contact: ###-####. start of 24 hr pressure test on 5th floor down stream of zone valves
|
Plumbing Rough-in | 1/11/2007 | 1/11/2007 | 1/11/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/11/2007 at 5:35:10 AM. Contact: ###-####. DWV for 4th floor room,s 47201,02,03,04,05,06,06A ,08,09,15, 47101,02,03,04,05,06,47002,03,04,05,06,07,08,and 09 test ok
|
Plumbing Rough-in | 1/9/2007 | 1/10/2007 | 1/10/2007 | P | CANC |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/9/2007 at 8:05:32 PM. Contact: ###-####. canc by Dennis
|
Plumbing Rough-in | 1/9/2007 | 1/10/2007 | 1/10/2007 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/9/2007 at 8:04:33 PM. Contact: ###-####. entry area roof and over flow drains test ok need some additional hanger,s
|
Plumbing Rough-in | 1/9/2007 | 1/9/2007 | 1/9/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/9/2007 at 10:56:08 AM. Contact: ###-####. DWV on south west side of building 4th floor test ok
|
Plumbing Rough-in | 1/8/2007 | 1/8/2007 | 1/8/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/8/2007 at 8:39:58 AM. Contact: ###-####. in wall water rough-in on 4th floor room # 47202 test ok DWV rough-in for 4th floor room,s # 47107,08,09,10, 12,13, 14, 16,17,18,19,20,21,22, 47217,and 47301 test ok
|
Plumbing Rough-in | 1/4/2007 | 1/5/2007 | 1/5/2007 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/4/2007 at 4:15:37 PM. Contact: ###-####. water rough-in on fourth floor in wall for room,s 47001, 02,03,04,05,06,and08 test ok
|
Plumbing Rough-in | 1/4/2007 | 1/4/2007 | 1/4/2007 | P | PART |
Jim Johnson
|
|
|
in wall water rough-in on 4th floor for rooms, 47001, 47101,47103,and47104 dwv on 4th floor for room,s 47309,12,13,15,16,and 47318 test ok
|
Plumbing Rough-in | 1/3/2007 | 1/4/2007 | 1/4/2007 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/3/2007 at 3:32:38 PM. Contact: ###-####.
|
Plumbing Rough-in | 1/3/2007 | 1/3/2007 | 1/3/2007 | P | PART |
Jim Johnson
|
|
|
fourth floor in wall rough-in water only for room,s 47110, 12,13,14,15, 16, 47217,47301,05,06,and08
|
Med/Gas Systems | 1/3/2007 | 1/3/2007 | 1/3/2007 | P | PART |
Jim Johnson
|
|
|
24 hr pressure test on third floor south side of building down stream of zone valves test ok
|
Med/Gas Systems | 1/2/2007 | 1/2/2007 | 1/3/2007 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/2/2007 at 10:54:44 AM. Contact: ###-####. start of 24 hr. pressure test on med gas on south side of third floor down stream of zone valves
|
Plumbing Rough-in | 12/29/2006 | 12/29/2006 | 12/29/2006 | P | PART |
Jim Johnson
|
|
|
in wall water rough-in for fourth floor room,s 47109,17,18,19,20,and 47122 test ok
|
Med/Gas Systems | 12/28/2006 | 12/29/2006 | 12/29/2006 | P | PASS |
Jim Johnson
|
|
|
24 hr. pressure test on med gas for fourth floor test ok
|
Plumbing Rough-in | 12/28/2006 | 12/28/2006 | 12/28/2006 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/28/2006 at 7:27:37 AM. Contact: ###-####. fourth floor in wall water rough-in for room,s 47203,04, 47121,22, 47309 test ok 4th floor DWV for room,s 47620,30,31,32,47402,01,and 47317 test ok
|
Med/Gas Systems | 12/28/2006 | 12/28/2006 | 12/28/2006 | P | PART |
Jim Johnson
|
|
|
start of 24 hr pressure test south west side fourth floor of building
|
Plumbing Rough-in | 12/26/2006 | 12/27/2006 | 12/27/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/26/2006 at 3:17:55 PM. Contact: ###-####. in wall water rough-in on fourth floor for room,s 47201 and 03 test ok
|
Plumbing Rough-in | 12/20/2006 | 12/22/2006 | 12/22/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/20/2006 at 2:59:05 PM. Contact: ###-####. fourth floor in wall water rough-in for room,s 47312,13,15, 47206a,47208,and 09 test ok DWV on fourth floor for room,s 47601, 02,03,04,05,06,07,08,09 test ok need to correct 1/3 of total permitted length of two inch vent installed in horizontal position on south side of building on fourth floor as per table 7-5 upc need to correct yoke vent installation on fourth floor as per 2003 upc 907.2 and 907.1
|
Plumbing Rough-in | 12/19/2006 | 12/20/2006 | 12/20/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/19/2006 at 3:44:17 PM. fourth floor in wall water rough-in for room,s 47630, 31,32, 47401,02, and47317 test ok
|
Plumbing Rough-in | 12/19/2006 | 12/19/2006 | 12/19/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/19/2006 at 6:29:33 AM. Contact: ###-####. in wall rough-in for water in room,s 47211, 10, and 13 and 47503, 47629, and 47620 test ok
|
Plumbing Rough-in | 12/18/2006 | 12/18/2006 | 12/18/2006 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/18/2006 at 7:41:00 AM. Contact: ###-####. water in wall rough-in for room,s 47601 , 02,03,04,05,06,08, and 09 test ok
|
Plumbing Rough-in | 12/12/2006 | 12/13/2006 | 12/13/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/12/2006 at 4:01:20 PM. Contact: ###-#### test on under floor piping in center portion for fifth floor test ok need to repipe vent and trap arm on one water closet and retest that portion of DWV piping
|
Med/Gas Systems | 12/6/2006 | 12/7/2006 | 12/7/2006 | A | PART |
Jim Johnson
|
|
|
24 hr pressure test on down stream side of zone valves located on south east side of building for med gas test ok note under floor plumbing rough-in for fifth floor room,s 57701 03,04,05,06,07 and 57611,613, and 57901 and 03 test ok
|
Med/Gas Systems | 12/6/2006 | 12/6/2006 | 12/6/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/6/2006 at 6:13:41 AM. Contact: ###-####. start of fourth floor 24 hr pressure test
|
Plumbing Rough-in | 12/1/2006 | 12/4/2006 | 12/4/2006 | A | PART |
Jim Johnson
|
|
|
center section and east side of fourth floor DWV and water in wall test ok need some additional hangers and riser clamps and nail plates
|
Plumbing Rough-in | 12/1/2006 | 12/1/2006 | 12/1/2006 | P | CANC |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/1/2006 at 10:42:43 AM. Contact: ###-####.
|
Final | 11/14/2006 | 11/14/2006 | 11/14/2006 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 11/14/2006 at 10:09:01 AM. Contact: ###-####. temp. for pharmacy
|
Med/Gas Systems | 11/7/2006 | 11/8/2006 | 11/8/2006 | A | PART |
Jim Johnson
|
|
|
24 hr hour med gas pressure test on O. R room,s on second floor test ok
|
Med/Gas Systems | 11/6/2006 | 11/7/2006 | 11/7/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 11/6/2006 at 4:36:12 PM. Contact: ###-####. start of 24 hr pressure test for piping down stream of valve boxs to boom location in second floor o. r . room,s
|
Plumbing Rough-in | 10/19/2006 | 10/19/2006 | 10/19/2006 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 10/19/2006 at 10:56:34 AM. Contact: ###-####. rough-in for bath room group and mop sink on first floor north side test ok ok to cover
|
Med/Gas Systems | 10/12/2006 | 10/12/2006 | 10/12/2006 | P | PART |
Daryl Spivey
|
|
|
24 hr test 1st 4 op rms tested to booms...150 lb test ok...ds
|
Med/Gas Systems | 10/10/2006 | 10/11/2006 | 10/11/2006 | A | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 10/10/2006 at 2:08:14 PM. Contact: ###-####. Start 24 hr test from zone valves to 4 op. rms on 2nd fl...ds
|
Plumbing Rough-in | 9/15/2006 | 9/15/2006 | 9/15/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 9/15/2006 at 6:51:16 AM. Contact: ###-####. third floor water hot and cold main,s test ok
|
Plumbing Rough-in | 9/6/2006 | 9/6/2006 | 9/6/2006 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 9/6/2006 at 10:58:45 AM. Contact: ###-####. rough-in on 3rd floor area,s 4 and 5 test ok ok to cover
|
Med/Gas Systems | 9/5/2006 | 9/6/2006 | 9/6/2006 | A | PART |
Jim Johnson
|
|
|
24 hr pressure test ok on mains up to zone valves
|
Plumbing Rough-in | 9/1/2006 | 9/5/2006 | 9/5/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 9/1/2006 at 12:34:57 PM. Contact: ###-####. start of 24 hr pressure test on med gas main,s up to zone valves
|
Med/Gas Systems | 8/30/2006 | 8/31/2006 | 8/31/2006 | A | PART |
Jim Johnson
|
|
|
24 hr pressure test on second floor med gas main trunk lines up to wall zone valves test ok still need to test down stream of zone valves still need some additional labeling of piping and valves
|
Med/Gas Systems | 8/30/2006 | 8/30/2006 | 8/30/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 8/30/2006 at 6:24:35 AM. Contact: ###-####. start of 24 hr pressure test on second floor
|
Plumbing Rough-in | 8/15/2006 | 8/15/2006 | 8/15/2006 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 8/15/2006 at 7:52:43 AM. Contact: ###-####. main water line building supply test ok roof drain,s on west side of fourth floor sun deck test ok
|
Plumbing Rough-in | 8/10/2006 | 8/11/2006 | 8/11/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 8/10/2006 at 4:32:14 PM. Contact: ###-####. third floor roof and over-flow drains vent,s for four room on west side of building test ok
|
Other | 8/4/2006 | 8/4/2006 | 8/4/2006 | P | FAIL |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 8/4/2006 at 7:50:08 AM. Contact: ###-####. as per 2003 upc 604.1 IAPMO installation standards PVC water building supply shall not be installed with in or under any building or structure
|
Plumbing Rough-in | 7/25/2006 | 7/25/2006 | 7/25/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 7/25/2006 at 5:54:05 AM. Contact: ###-####. water and DWV for room,s 37608 37610, 37516, 37518, 37523, 37520, 37522, 37524, 37525, and 37216 test ok and water only for room,s 37208A, 37205, 37203, 37108, 37109, 37111, and 37210 test ok
|
Plumbing Rough-in | 7/20/2006 | 7/21/2006 | 7/21/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 7/20/2006 at 3:20:24 PM. Contact: ###-####. in wall water and dwv in middle section test ok
|
Plumbing Rough-in | 7/18/2006 | 7/19/2006 | 7/19/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 7/18/2006 at 2:32:02 PM. Contact: ###-#### in wall rough-in for following room,s37609,37610, 37902,37903,37901,37805,37804,37803,37802,37801,37513,37512,37511,37510,37509,37508,37507,37506,37503,37502,37501,37213,37519,37519,37518,37517,37516,37515,and37514 test ok.
|
Plumbing Rough-in | 7/14/2006 | 7/14/2006 | 7/14/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 7/14/2006 at 7:03:00 AM. Contact: ###-####. in wall water and dwv vent,s on six room,s on third floor south west side of building test ok
|
Plumbing Rough-in | 7/7/2006 | 7/7/2006 | 7/7/2006 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 7/7/2006 at 8:06:39 AM. Contact: ###-####. in wall rough-in for water and DWV test ok for south east portion of third floor
|
Plumbing Rough-in | 7/6/2006 | 7/6/2006 | 7/6/2006 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 7/6/2006 at 7:53:31 AM. Contact: ###-####.DWV test ok for room,s 37610,37614,37611, 37212,37615,37202,37417,37620,and 37419
|
Plumbing Rough-in | 7/5/2006 | 7/5/2006 | 7/5/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 7/5/2006 at 7:30:49 AM. Contact: ###-####.
|
Plumbing Rough-in | 6/29/2006 | 6/30/2006 | 6/30/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 6/29/2006 at 3:32:47 PM. Contact: ###-####.rough-in for room,s 37705,37704,37703,37701,37906,37904,377623,and 37625 test ok
|
Plumbing Rough-in | 6/28/2006 | 6/28/2006 | 6/28/2006 | A | CANC |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 6/28/2006 at 6:43:48 AM. Contact: ###-####. Talked to Victor, he will add more plumbing to test and call back for Friday.
|
Plumbing Rough-in | 6/20/2006 | 6/20/2006 | 6/20/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 6/20/2006 at 7:21:47 AM. Contact: ###-####.dwv in room 17083 test ok
|
Plumbing Rough-in | 6/16/2006 | 6/16/2006 | 6/16/2006 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 6/16/2006 at 10:43:55 AM. Contact: ###-####. room 17803 water test ok test on DWV failed need to retest
|
Plumbing Rough-in | 6/15/2006 | 6/15/2006 | 6/15/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 6/15/2006 at 7:25:30 AM. Contact: ###-####. south west side of building DWV third floor under floor test ok
|
Plumbing Rough-in | 6/14/2006 | 6/14/2006 | 6/14/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 6/14/2006 at 7:12:35 AM. Contact: ###-####. TEST FAILED on third floor under floor DWV on south west side of building need to correct leak and recall when ready
|
Plumbing Rough-in | 6/9/2006 | 6/13/2006 | 6/13/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 6/9/2006 at 3:24:13 PM. Contact: ###-####. third floor under floor DWV on north west side of building test ok
|
Plumbing Rough-in | 6/9/2006 | 6/9/2006 | 6/9/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 6/9/2006 at 6:33:00 AM. Contact: ###-####. north west portion of third floor under floor DWV test ok
|
Plumbing Rough-in | 6/7/2006 | 6/8/2006 | 6/8/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 6/7/2006 at 2:32:44 PM. Contact: ###-####. need to correct leak in third floor under floor DWV
|
Plumbing Rough-in | 6/7/2006 | 6/7/2006 | 6/7/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 6/7/2006 at 5:57:51 AM. Contact: ###-####. need to test DWV under floor drain,s in north-west section of tower and repipe mop sink so tailpiece from fixture does not exceed twenty-four inches in length in walk through with Victor for this inspection
|
Plumbing Rough-in | 5/31/2006 | 6/1/2006 | 6/1/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/31/2006 at 2:27:47 PM. Contact: ###-####. DWV test ok for rooms 27702, 27703,and 27704
|
Plumbing Rough-in | 5/30/2006 | 5/31/2006 | 5/31/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/30/2006 at 4:13:20 PM. Contact: ###-####. DWV in room,s 27713 and 27714 test ok
|
Plumbing Rough-in | 5/26/2006 | 5/30/2006 | 5/30/2006 | A | PART |
Jim Johnson
|
|
|
DWV and water test ok in room,s 27717, 27718, 28011, 28008, 28009,and 28005
|
Plumbing Rough-in | 5/26/2006 | 5/26/2006 | 5/26/2006 | P | CANC |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/26/2006 at 8:00:59 AM. Contact: ###-####.
|
Plumbing Rough-in | 5/24/2006 | 5/25/2006 | 5/25/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/24/2006 at 3:56:15 PM. Contact: ###-####. rough-in in room 27906 water only test ok rough-in for in wall and under floor DWV and water in room,s 28001, 28004,and28006 test ok
|
Plumbing Rough-in | 4/18/2006 | 4/18/2006 | 4/18/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/18/2006 at 6:46:09 AM. Contact: ###-####. rough-in plumbing on second floor west side test ok ok to cover
|
Plumbing Rough-in | 4/14/2006 | 4/14/2006 | 4/14/2006 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/14/2006 at 10:56:33 AM. Contact: ###-####. test for DWV in room,s 27906 and 27906-a test ok
|
Plumbing Rough-in | 4/11/2006 | 4/12/2006 | 4/12/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/11/2006 at 2:52:18 PM. Contact: ###-####. DWV for second floor test ok on west side of building
|
Plumbing Rough-in | 4/6/2006 | 4/6/2006 | 4/6/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/6/2006 at 6:34:36 AM. Contact: ###-####. hot and cold water on west side of building second floor test ok
|
Plumbing Rough-in | 3/30/2006 | 3/30/2006 | 3/30/2006 | P | PASS |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 3/30/2006 at 10:38:56 AM. Contact: ###-####. R/I for rooms 27602 and 27603 tested and passed. ds
|
Plumbing Rough-in | 3/29/2006 | 3/29/2006 | 3/29/2006 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 3/29/2006 at 10:57:18 AM. Contact: ###-####. dwv rooms 27308, 27312, and 27313 test ok
|
Plumbing Rough-in | 3/28/2006 | 3/28/2006 | 3/28/2006 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/28/2006 at 8:12:53 AM. Contact: ###-####. DWV only rough-in in area b second floor room,s 27407 & 27406 test ok
|
Plumbing Rough-in | 3/24/2006 | 3/24/2006 | 3/24/2006 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/24/2006 at 10:29:53 AM. Contact: ###-####. rough-in for DWV only for second floor room,s 27412, 27413 and 27414 test ok
|
Plumbing Rough-in | 3/23/2006 | 3/23/2006 | 3/23/2006 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/23/2006 at 11:02:01 AM. Contact: ###-####. dwv under floor wall,s and over head vent,s test ok for second floor room,s 27421 and 27423
|
Plumbing Rough-in | 3/16/2006 | 3/16/2006 | 3/16/2006 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/16/2006 at 10:57:21 AM. Contact: ###-####. rough -in plumbing test ok as noted on plan,s for this date 6/16/06
|
Plumbing Rough-in | 3/15/2006 | 3/15/2006 | 3/15/2006 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/15/2006 at 10:49:20 AM. Contact: ###-####. main hot and cold and recir line in basement test ok
|
Plumbing Rough-in | 3/9/2006 | 3/9/2006 | 3/9/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/9/2006 at 6:05:14 AM. Contact: ###-####. 24 hr pressure test for med-gas on first floor test ok and DWV highlighted in blue in general contractor job office test ok
|
Med/Gas Systems | 3/8/2006 | 3/8/2006 | 3/8/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/8/2006 at 6:38:16 AM. Contact: ###-####. start of 24 hr test on med gas on first floor
|
Plumbing Rough-in | 3/1/2006 | 3/1/2006 | 3/1/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 3/1/2006 at 7:09:54 AM. Contact: ###-####. vent,s for basement and first floor and drain,s for first floor test ok note need some additional hangers on pvc dwv piping
|
Med/Gas Systems | 2/24/2006 | 2/27/2006 | 2/27/2006 | A | PART |
Jim Johnson
|
|
|
med gas piping as noted on plan,s in RM job trailer for this date 2/27/06 24 hr. pressure test ok. ( note all vacuume from this date on will be brazed as required in NFPA 99C 2002 edition as per my conversation with Lee Rice chief plumbing inspector
|
Med/Gas Systems | 2/24/2006 | 2/24/2006 | 2/24/2006 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 2/24/2006 at 10:57:37 AM. Contact: ###-####. start of 24 hr pressure test on med gas from boiler room up too second floor
|
PLM-Aging Inspection | 2/20/2006 | 2/20/2006 | 2/21/2006 | | PASS |
Jim Johnson
|
|
|
|
Plumbing Rough-in | 12/21/2005 | 12/21/2005 | 12/21/2005 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/21/2005 at 9:55:03 AM. Contact: ###-#### first floor hot and cold water main,s test ok.
|