Final | 4/4/2006 | 4/5/2006 | 4/5/2006 | A | PASS |
Daryl Spivey
|
|
|
brandon Internet Inspection Request from: Brandon Rohricht No job sign off card on site. ds
|
Final | 4/3/2006 | 4/4/2006 | 4/4/2006 | P | PART |
Bill VanDegrift
|
|
|
Brandon Internet Inspection Request from: Brandon Rohricht everything is ok except the sprinkler dcva's outside need 6" of clearance under them.
|
Other | 3/30/2006 | 3/31/2006 | 3/31/2006 | A | PASS |
Bill VanDegrift
|
|
|
9am install one dcva, expantion tank, and extend west unit water supply to new piping above dcva and install shutoff valve in that unit, test two dcva's in the yard sprinkler system.
|
Other | 3/30/2006 | 3/30/2006 | 3/30/2006 | P | PASS |
Bill VanDegrift
|
|
|
9am met bill thompson to go over premis protection, need to meet brandon in the morning to check water routing
|
Final | 3/10/2006 | 3/10/2006 | 3/10/2006 | P | PART |
Gary Ziegler
|
|
|
Internet Inspection Request from: Brandon Rohricht install tempering devices lavs, have backflow survey on structure
|
Plumbing Rough-in | 2/21/2006 | 2/21/2006 | 2/21/2006 | P | PASS |
Daryl Spivey
|
|
|
Brandon Internet Inspection Request from: Brandon Rohricht
|
Groundwork | 2/14/2006 | 2/14/2006 | 2/14/2006 | P | PASS |
Daryl Spivey
|
|
|
###-#### - brandon
|
Plumbing Rough-in | 1/24/2006 | 1/24/2006 | 1/24/2006 | P | PART |
Daryl Spivey
|
|
|
Partial rough in Brandon. Internet Inspection Request from: Brandon Rohricht R/I passed on mens restroom, east side. ds
|
Groundwork | 1/17/2006 | 1/17/2006 | 1/17/2006 | P | PART |
Bill VanDegrift
|
|
|
Brandon Internet Inspection Request from: Brandon Rohricht east restroom gw ok, needs to repair a couple of water lines in the slab on the west restroom and complete the janitor sink gw.
|