Final | 7/3/2006 | 7/3/2006 | 7/3/2006 | P | PASS |
Daryl Spivey
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
Final | 6/19/2006 | 6/19/2006 | 6/19/2006 | P | FAIL |
Jim Johnson
|
|
|
BILL; Phone #: ###-#### Internet Inspection Request from: Darla Downs anchor dish washer drain to bottom of kitchen counter caulk sink in garage to wall anchor hose bibb in back of home knock out correct opening in washer box for drain and provide trim plate for washer box left correction notice on job site
|
Plumbing Rough-in | 2/7/2006 | 2/7/2006 | 2/7/2006 | P | PASS |
Daryl Spivey
|
|
|
bill; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Plumbing Rough-in | 2/6/2006 | 2/6/2006 | 2/6/2006 | P | FAIL |
Daryl Spivey
|
|
|
Bill -- reinspection for corrections; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong Needs softner drain loop, move upstairs lav water inside of an outside wall and lav valves need protection against freezing, 2" vent needs supported upstairs in Master, washer stack needs base of stack c/o, water in crawl still not properly supported, and no test on waste and vent. ds
|
Plumbing Rough-in | 2/1/2006 | 2/1/2006 | 2/1/2006 | P | FAIL |
Bill VanDegrift
|
|
|
Bill -- for reinspection; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong install trap for 2nd floor tub, above 1st floor bath, so it can be inspected, hang waste piping above 1st floor bath, nail plate water softenor loop, move washer box water to inside face of exterior 2x6 wall, move master showerhead water lines to inside face of 2x6 exterior wall, hang water service piping in the crawlspace every 32", use a perm. cap on 3" open wye in crawlspace.
|
Plumbing Rough-in | 1/31/2006 | 1/31/2006 | 1/31/2006 | P | FAIL |
Daryl Spivey
|
|
|
Bill ###-#### Water waste and vent needs strapped better. needs base of stack c/o on 3" stacks, No softner loop installed and missing some nail plates. Also water lines in garage for l/s needs to be anchored. ds
|