PLM-Aging Inspection | 10/5/2006 | 10/5/2006 | 10/5/2006 | | PASS |
Bill VanDegrift
|
|
|
|
Final | 10/5/2006 | 10/5/2006 | 10/5/2006 | P | PASS |
Bill VanDegrift
|
|
|
|
Water and/or Sewer | 8/4/2006 | 8/4/2006 | 8/4/2006 | P | PART |
Bill VanDegrift
|
|
|
exterior rain water piping test ok
|
PLM-Aging Inspection | 7/24/2006 | 7/24/2006 | 7/24/2006 | | PASS |
Bill VanDegrift
|
|
|
|
PLM-Aging Inspection | 5/23/2006 | 5/23/2006 | 5/23/2006 | | PASS |
Bill VanDegrift
|
|
|
|
Water and/or Sewer | 3/22/2006 | 3/23/2006 | 3/23/2006 | A | PART |
Bill VanDegrift
|
|
|
Wally -- sewer line; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong pressure sewer tank to street ok to cover. still needs vent off tank.
|
Other | 3/17/2006 | 3/17/2006 | 3/17/2006 | A | PASS |
Bill VanDegrift
|
|
|
picked up revised P-1 and site plan R1P1.0 showing redesign on the pump sewer system and rerouting of the pressure sewer.
|
Water and/or Sewer | 3/15/2006 | 3/16/2006 | 3/16/2006 | A | FAIL |
Bill VanDegrift
|
|
|
Wally -- sewer line ; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong provide revised plans showing relocated pump chamber and pressure sewer system and piping changes within the building.
|
Other | 3/14/2006 | 3/14/2006 | 3/14/2006 | A | PASS |
Bill VanDegrift
|
|
|
needs 6" to pump tank, pressure sewer system redesign still need submittal, needs to check with public works about discharge size, plan shows a 4" pump line leaving the tank and the site plan shows a 3" main line in the street.
|
Water and/or Sewer | 2/22/2006 | 2/23/2006 | 2/23/2006 | P | PART |
Bill VanDegrift
|
|
|
Wally -- for water line only; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong water service test ok to cover
|
Water and/or Sewer | 2/13/2006 | 2/14/2006 | 2/14/2006 | P | NR |
Bill VanDegrift
|
|
|
Wally -- for water line; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong water line not in and the venting for the interceptor is not correct.
|