Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberPLM06-00445
StatusFinaled
Name GORHAM PLUMBING & MECHANICAL
Site Address 6455 S EISENMAN RD
Project NameHarris Auto Sales Facility
Customer Number 
ePlanReview 
Description
2-16-06 Harris Auto; waste water running pipe to flammable liquid interceptor; Cert of Value $27,172.00 eus
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final10/11/200610/12/200610/12/2006APASS
DetailsBill VanDegrift
Contact name: Daren Gorham; Phone #: ###-#### Internet Inspection Request from: Michelle Gorham
Final10/6/200610/6/200610/6/2006PFAIL
DetailsBill VanDegrift
Phone #: ###-#### Internet Inspection Request from: Michelle Gorham pump chamber is not piped through the roof. locate flammable liquids interceptor vents. trap primer lines in riser room incomplete. leak under lav, breakroom sink spout missing. air gap t&p drain. install non-poable water system in shop. set drinking fountain downstairs. caulk lav in basement. what 3/4 copper by hose bib main level south side.
PLM-Aging Inspection9/11/20069/11/20069/11/2006 PASS
DetailsBill VanDegrift
wip
Water and/or Sewer7/10/20067/10/20067/10/2006PPASS
DetailsDaryl Spivey
Rough In Inspection. Contact name is Daren.; Phone #: ###-#### Internet Inspection Request from: Michelle Gorham
Plumbing Rough-in7/10/20067/10/20067/10/2006PPASS
DetailsDaryl Spivey
Rough In Inspection. Contact name is Daren.; Phone #: ###-#### Internet Inspection Request from: Michelle Gorham
Water and/or Sewer5/25/20065/26/20065/26/2006APASS
DetailsBill VanDegrift
Inspection on underground piping for Flammable Liquids Interceptor; Phone #: ###-#### Internet Inspection Request from: Michelle Gorham
Plumbing Rough-in5/8/20065/8/20065/9/2006PPART
DetailsBill VanDegrift
call if you have problems; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung flammable liquids interceptor test ok. can use test tee by overhead door as a sample port if brought to grade.
Groundwork4/13/20064/14/20064/14/2006APART
DetailsBill VanDegrift
Darin; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong everything except the vent for the pump chamber, needs core drill.
Plumbing Rough-in2/16/20062/17/20062/17/2006ACANC
DetailsDaryl Spivey
Gorham Plumbing & Mechanical -- sewer line and grease interceptor (waste water running pipe to flammable liquid interceptor); Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
Groundwork2/17/20062/17/20062/17/2006APART
DetailsDaryl Spivey
Gorham Plumbing & Mechanical -- sewer line and grease interceptor (waste water running pipe to flammable liquid interceptor); Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
2 3" lines ran on exterior from one area to bay on south side of building. ds