Final | 12/6/2006 | 12/7/2006 | 12/7/2006 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/6/2006 at 3:21:34 PM. Contact: ###-####.
|
Final | 12/7/2006 | 12/8/2006 | 12/7/2006 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/7/2006 at 3:36:57 PM. Contact: ###-####.
|
Final | 12/4/2006 | 12/5/2006 | 12/5/2006 | A | NR |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/4/2006 at 2:59:13 PM. Contact: ###-####. not ready
|
PLM-Aging Inspection | 11/20/2006 | 11/20/2006 | 11/20/2006 | | PASS |
Jim Johnson
|
|
|
|
Plumbing Rough-in | 9/19/2006 | 9/20/2006 | 9/20/2006 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 9/19/2006 at 3:49:02 PM.
|
Other | 9/12/2006 | 9/13/2006 | 9/13/2006 | A | PART |
Jim Johnson
|
|
|
toby - conference ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley conf. only on roof drains
|
Groundwork | 8/24/2006 | 8/25/2006 | 8/25/2006 | A | PASS |
Jim Johnson
|
|
|
ima ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
Water and/or Sewer | 7/14/2006 | 7/17/2006 | 7/17/2006 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 7/14/2006 at 9:14:50 AM. Contact: ###-####. continued sewer from east side of building to front of building on south side test ok note not connected to sewer stub in at property line unable to meet grade for new sewer line
|
Plumbing Rough-in | 7/10/2006 | 7/11/2006 | 7/11/2006 | A | PASS |
Jim Johnson
|
|
|
Ina - grease trap insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley grease intercepter water test ok
|
Water and/or Sewer | 6/28/2006 | 6/29/2006 | 6/29/2006 | A | NR |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 6/28/2006 at 3:20:32 PM. Contact: ###-####.
|
Water and/or Sewer | 6/28/2006 | 6/28/2006 | 6/28/2006 | P | PART |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 6/28/2006 at 8:42:56 AM. interceptor to be filled to the top - sewer on east side to be connected to stub and tested yet.
|
Water and/or Sewer | 6/27/2006 | 6/27/2006 | 6/27/2006 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 6/27/2006 at 9:04:31 AM. Contact: ###-####. grease intercepter piping upstream and down stream of intercepter to sanitary sewer tie in on east side of building air test ok still need to finish sewer line to emerald street and finish water line and test also need to fill grease interceptor with water for test contractor to call when ready
|
PLM-Aging Inspection | 6/19/2006 | 6/19/2006 | 6/20/2006 | | PASS |
Jim Johnson
|
|
|
project still under construction
|
Plumbing Rough-in | 4/18/2006 | 4/19/2006 | 4/19/2006 | P | NR |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/18/2006 at 8:11:10 AM. Contact: ###-####.
|
Plumbing Rough-in | 4/18/2006 | 4/19/2006 | 4/19/2006 | A | NR |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/18/2006 at 3:06:08 PM. Contact: ###-####. not ready
|
Groundwork | 4/19/2006 | 4/19/2006 | 4/19/2006 | A | PASS |
Jim Johnson
|
|
|
this inspection is for sewer and grease line trunk lines and water stub in (copper) only
|