Water and/or Sewer | 5/26/2006 | 5/26/2006 | 5/26/2006 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 5/26/2006 at 7:55:34 AM. Contact: ###-####. north side sewer ok,
|
Final | 5/26/2006 | 5/26/2006 | 5/26/2006 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 5/26/2006 at 7:55:34 AM. Contact: ###-####.
|
Water and/or Sewer | 5/5/2006 | 5/5/2006 | 5/9/2006 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 5/5/2006 at 7:28:49 AM. Contact: ###-####. interceptor and piping to the west, still needs connection to the north.
|
Water and/or Sewer | 5/4/2006 | 5/5/2006 | 5/5/2006 | A | NR |
Bill VanDegrift
|
|
|
interceptor test
|
Water and/or Sewer | 5/4/2006 | 5/4/2006 | 5/4/2006 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 5/4/2006 at 7:30:03 AM. Contact: ###-####.sewer from tank to tie in test ok, interceptor test starting. no connections to the building yet, picked up lot line adjustment in lue of easement.
|