Water and/or Sewer | 6/8/2006 | 6/9/2006 | 6/9/2006 | A | PASS |
Jim Johnson
|
|
|
hillside landscape const-sewer only; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
DOC - Permit Finaled | 6/9/2006 | 6/9/2006 | 6/9/2006 | A | PASS |
Jim Johnson
|
|
|
hillside landscape const-sewer only; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
Water and/or Sewer | 6/7/2006 | 6/8/2006 | 6/8/2006 | A | NR |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 6/7/2006 at 4:46:54 PM. Contact: ###-####. not ready no test
|
Water and/or Sewer | 6/7/2006 | 6/7/2006 | 6/7/2006 | P | FAIL |
Jim Johnson
|
|
|
hillside nursery - ###-#### need to remove pvc tee,s installed for cleanout,s and replace with approved directional clean out fitting,s need to remove 3034 pvc gravity sewer pipe in side foundation and replace with approved material need to water or air test sewer line contractor to recall when ready
|
Water and/or Sewer | 5/31/2006 | 6/1/2006 | 6/1/2006 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/31/2006 at 2:17:18 PM. Contact: ###-####. water line test ok ok to cover
|
Water and/or Sewer | 5/26/2006 | 5/30/2006 | 5/26/2006 | A | CANC |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/26/2006 at 3:58:12 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on May 26 2006 4:46PM.
|
Water and/or Sewer | 5/26/2006 | 5/26/2006 | 5/26/2006 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/26/2006 at 9:11:20 AM. Contact: ###-####. water line need to still be tested contractor to recall when ready
|