Final | 11/1/2007 | 11/8/2007 | 11/8/2007 | A | PASS |
Eric Strole
|
|
|
Michael ###-####
|
Final | 11/5/2007 | 11/6/2007 | 11/6/2007 | A | PASS |
Eric Strole
|
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
Final | 10/26/2007 | 10/29/2007 | 10/29/2007 | P | PART |
Eric Strole
|
|
|
MIke; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt-finish all trim, caulk all fixtures, pull sprinkler permit for landscape.
|
Plumbing Rough-in | 2/16/2007 | 2/20/2007 | 2/20/2007 | A | PASS |
Jim Johnson
|
|
|
michael ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
Plumbing Rough-in | 2/13/2007 | 2/14/2007 | 2/14/2007 | A | FAIL |
Eric Strole
|
|
|
MIKE; Phone #: ###-#### Internet Inspection Request from: Victoria Beall-support dwv every 4', vents need to be level or graded, need 3 1/2" of insulation for water lines in exteriour walls, need to tent overhead water line for rain head, need c/o on 4" building drain, hook up vent for master tub, need 1/4" per ft on horizontal drains.
|
Plumbing Rough-in | 1/26/2007 | 1/29/2007 | 1/29/2007 | P | FAIL |
Eric Strole
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Victoria Beall-dwv test failed, to many fixture units on 1/2" pex line, support dwv every 4', fix backgrade on dwv, tent water line for rain head, c/o's required on drain lines over 5' from building drain, need 31/2" insulation for water lines on exteriour walls, need to strap pex every 32".
|
Groundwork | 7/11/2006 | 7/11/2006 | 7/11/2006 | P | PASS |
Eric Strole
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|