Final | 2/14/2007 | 2/14/2007 | 2/14/2007 | P | PASS |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 1/29/2007 | 1/29/2007 | 1/29/2007 | | NR |
Eric Strole
|
|
|
wip
|
PLM-Aging Inspection | 11/28/2006 | 11/28/2006 | 11/28/2006 | | NR |
Eric Strole
|
|
|
wip
|
Med/Gas Systems | 9/25/2006 | 9/26/2006 | 9/26/2006 | A | PASS |
Eric Strole
|
|
|
frank ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
Plumbing Rough-in | 9/22/2006 | 9/25/2006 | 9/25/2006 | A | PART |
Eric Strole
|
|
|
frank; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles-started 24 hr test on instrument air, 8.30 am on 9-25 start at 164 psi.
|
Med/Gas Systems | 7/13/2006 | 7/14/2006 | 7/14/2006 | P | PASS |
Eric Strole
|
|
|
frank; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
Med/Gas Systems | 7/13/2006 | 7/13/2006 | 7/13/2006 | P | CANC |
Bill VanDegrift
|
|
|
1:30 no time
|
Groundwork | 7/13/2006 | 7/13/2006 | 7/13/2006 | P | PART |
Eric Strole
|
|
|
frank; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley-ok to cover-will call in for 24 hour air test.
|