Final | 2/2/2007 | 2/2/2007 | 2/2/2007 | P | PASS |
Jim Johnson
|
|
|
less; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
Plumbing Rough-in | 11/2/2006 | 11/3/2006 | 11/3/2006 | A | PASS |
Eric Strole
|
|
|
les; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
Plumbing Rough-in | 11/1/2006 | 11/2/2006 | 11/2/2006 | A | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 11/1/2006 at 2:46:12 PM. Contact: ###-####.-r/i pass, need r-13 insulation behind shower valve in master bath, will call when completed as per conversation with homeowner.
|
Plumbing Rough-in | 10/27/2006 | 10/30/2006 | 10/30/2006 | A | FAIL |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 10/27/2006 at 3:13:22 PM. Contact: ###-####. home owner need to change fitting,s in building drain line to approved directional fittings
|