Final | 5/23/2007 | 5/24/2007 | 5/24/2007 | A | PASS |
Eric Strole
|
|
|
cable ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
PLM-Aging Inspection | 4/13/2007 | 4/13/2007 | 4/16/2007 | | NR |
Eric Strole
|
|
|
wip
|
Plumbing Rough-in | 2/9/2007 | 2/9/2007 | 2/9/2007 | P | PART |
Eric Strole
|
|
|
cable ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie-bathroom r-i pass.
|
Plumbing Rough-in | 1/22/2007 | 1/22/2007 | 1/22/2007 | P | PART |
Eric Strole
|
|
|
ANDREW; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
Plumbing Rough-in | 1/10/2007 | 1/10/2007 | 1/10/2007 | P | PART |
Eric Strole
|
|
|
cable ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
Other | 1/5/2007 | 1/5/2007 | 1/8/2007 | P | PART |
Eric Strole
|
|
|
this was a meeting on jetted tubs,they need to be protected with rpbp's. there are 2 tubs.
|
Plumbing Rough-in | 1/2/2007 | 1/2/2007 | 1/2/2007 | P | PART |
Eric Strole
|
|
|
cable ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
Plumbing Rough-in | 12/18/2006 | 12/18/2006 | 12/18/2006 | P | PART |
Eric Strole
|
|
|
this was a g/w, g/w pass
|
Plumbing Rough-in | 12/18/2006 | 12/18/2006 | 12/18/2006 | P | CANC |
Eric Strole
|
|
|
|
Plumbing Rough-in | 12/18/2006 | 12/19/2006 | 12/18/2006 | A | CANC |
Eric Strole
|
|
|
cable ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
Plumbing Rough-in | 12/11/2006 | 12/11/2006 | 12/11/2006 | P | PART |
Eric Strole
|
|
|
Cable; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt-area 6 r/i complete.
|
Plumbing Rough-in | 11/27/2006 | 11/27/2006 | 11/27/2006 | P | PART |
Eric Strole
|
|
|
cable ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
Other | 11/2/2006 | 11/2/2006 | 11/2/2006 | P | PART |
Eric Strole
|
|
|
conferance on upgrades for health hazards.need rpbp on coffee maker-need dbcv on 2 ice makers-need to raise vacuum breaker for soap dispenser-need to reroute drains on equipment to an approved air gap-need to upgrade soap dispenser in kitchen or install rpbp.
|
Plumbing Rough-in | 11/1/2006 | 11/1/2006 | 11/2/2006 | P | PART |
Eric Strole
|
|
|
cable ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith-areas looked at ok.
|
Plumbing Rough-in | 10/19/2006 | 10/19/2006 | 10/19/2006 | P | PART |
Eric Strole
|
|
|
calbe; Phone #: ###-#### Internet Inspection Request from: Darla Downs-area 2 water piping complete.
|
Plumbing Rough-in | 10/4/2006 | 10/4/2006 | 10/4/2006 | P | PART |
Eric Strole
|
|
|
over head water to valve ends ok.
|
Groundwork | 10/3/2006 | 10/4/2006 | 10/4/2006 | P | CANC |
Eric Strole
|
|
|
On site Cable @ ###-####; J591; Phone #: ###-#### Internet Inspection Request from: Dixie Miyake
|