Final | 4/12/2007 | 4/13/2007 | 4/13/2007 | A | PASS |
Bill VanDegrift
|
|
|
Homeowner will be home until 11am..after that she will leave front door unlocked Phone #: ###-####
|
Plumbing Rough-in | 1/15/2007 | 1/16/2007 | 1/16/2007 | P | PASS |
Eric Strole
|
|
|
RE INSPECT ON BASEMENT BATHROOM Phone #: ###-####
|
Plumbing Rough-in | 1/11/2007 | 1/12/2007 | 1/12/2007 | A | PART |
Eric Strole
|
|
|
Rough in re inspection Phone #: ###-####-need to correct backgrade on existing 3" horizontal drain in overhead of new basement.
|
Plumbing Rough-in | 12/21/2006 | 12/22/2006 | 12/22/2006 | A | FAIL |
Eric Strole
|
|
|
re inspection; Phone #: ###-#### Internet Inspection Request from: Penny Smith-no more then 35 fixture units on a 3" horizontal drain, glue overhead cleanout plugs in, support dwv every 4'. ok to pull test.
|
Plumbing Rough-in | 12/14/2006 | 12/15/2006 | 12/15/2006 | P | NR |
Eric Strole
|
|
|
Someone will be there - Questions contact Leon at ###-####; Phone #: ###-#### Internet Inspection Request from: Penny Smith
|
Groundwork | 11/1/2006 | 11/2/2006 | 11/2/2006 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Internet Inspection Request from: Penny Smith
|