Final | 3/9/2007 | 3/9/2007 | 3/9/2007 | P | PASS |
Eric Strole
|
|
|
Britney; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
Final | 3/1/2007 | 3/1/2007 | 3/1/2007 | P | PART |
Eric Strole
|
|
|
Phone #: ###-####-t&p needs 1" airgap, a dbcv in the vertical the direction of flow needs to be up, not down. set dishwasher, no water to north side sink, dbcv needs tested & certifed
|
PLM-Aging Inspection | 2/26/2007 | 2/26/2007 | 2/26/2007 | | NR |
Eric Strole
|
|
|
wip
|
Plumbing Rough-in | 12/8/2006 | 12/11/2006 | 12/11/2006 | A | PASS |
Eric Strole
|
|
|
RAUL; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Roof Drains | 12/8/2006 | 12/8/2006 | 12/8/2006 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Internet Inspection Request from: raul castanon-test on roof drains pass, need approved plans on job site.do not cover.
|
Plumbing Rough-in | 12/6/2006 | 12/6/2006 | 12/6/2006 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Internet Inspection Request from: raul castanon-dwv & water test pass, need to add some hangers & test roof drains.
|
PLM-Aging Inspection | 11/30/2006 | 11/30/2006 | 11/30/2006 | | NR |
Eric Strole
|
|
|
wip
|
Groundwork | 9/26/2006 | 9/26/2006 | 9/26/2006 | P | PASS |
Eric Strole
|
|
|
brittany; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|