Final | 11/19/2006 | 11/20/2006 | 11/20/2006 | A | PASS |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 11/19/2006 at 4:39:36 PM. Contact: ###-####.
|
Plumbing Rough-in | 10/13/2006 | 10/16/2006 | 10/16/2006 | A | PASS |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 10/13/2006 at 5:10:03 PM. Contact: ###-####.
|
Plumbing Rough-in | 10/12/2006 | 10/13/2006 | 10/13/2006 | A | FAIL |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 10/12/2006 at 8:26:36 PM. Contact: ###-####.-move water lines up in joist space-cannot have 4 toilets on 3" horizontal drain-change fernco in crawl to approved fitting- fix t&p.
|