Final | 1/18/2007 | 1/19/2007 | 1/19/2007 | P | PASS |
Bill VanDegrift
|
|
|
Contact is Jade. Phone #: ###-####
|
Plumbing Rough-in | 11/15/2006 | 11/15/2006 | 11/15/2006 | P | PASS |
Eric Strole
|
|
|
nail plates and air chamber required
|
Plumbing Rough-in | 11/14/2006 | 11/15/2006 | 11/15/2006 | A | NR |
Bill VanDegrift
|
|
|
Inside plumbing rough-in inspection. Contact is Jade. ; Phone #: ###-#### Internet Inspection Request from: Dave Mogel needs nail plates and air chamber at the urinal
|
Groundwork | 11/6/2006 | 11/6/2006 | 11/6/2006 | A | PART |
Daryl Spivey
|
|
|
water test on interceptor tank ok ds
|
Groundwork | 10/31/2006 | 11/1/2006 | 11/1/2006 | A | PART |
Bill VanDegrift
|
|
|
Contact is Jade. ; Phone #: ###-#### Internet Inspection Request from: Dave Mogel piping to interceptor ok tank leaks
|
Groundwork | 10/18/2006 | 10/18/2006 | 10/18/2006 | P | PASS |
Eric Strole
|
|
|
Contact is Jade. We called this in yesterday around 4:45 & it doesn’t show as scheduled so please inspect as soon as possible.; Phone #: ###-#### Internet Inspection -Request from: Dave Mogel-water main to building pass.
|
Groundwork | 10/11/2006 | 10/11/2006 | 10/11/2006 | P | PASS |
Bill VanDegrift
|
|
|
|
Groundwork | 10/10/2006 | 10/11/2006 | 10/11/2006 | A | PART |
Bill VanDegrift
|
|
|
Jade; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt trench drain and vent ok
|
Groundwork | 10/5/2006 | 10/6/2006 | 10/6/2006 | A | PART |
Bill VanDegrift
|
|
|
Jade; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt 2" to sink in the nw corner
|