Final | 7/25/2007 | 7/25/2007 | 7/25/2007 | P | PASS |
Eric Strole
|
|
|
|
Final | 7/24/2007 | 7/25/2007 | 7/25/2007 | A | NR |
Eric Strole
|
|
|
Please call Shane with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Final | 7/13/2007 | 7/16/2007 | 7/16/2007 | A | PART |
Jim Johnson
|
|
|
Please call Shane with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel need to complete trim
|
Water and/or Sewer | 5/15/2007 | 5/16/2007 | 5/16/2007 | P | PASS |
Jim Johnson
|
|
|
This will be for the north part of the building. Please call Shane with any questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel this inspection completes shell and core rough-in
|
Water and/or Sewer | 5/3/2007 | 5/4/2007 | 5/4/2007 | A | PART |
Jim Johnson
|
|
|
This will be for the 5th & 6th floor. Please call Shane with any questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel rest room,s floor,s 1 through 5 south side of building for shell and core DWV and in wall water test ok. all roof and overflow drain,s test ok.
|
Plumbing Rough-in | 4/13/2007 | 4/16/2007 | 4/16/2007 | A | PART |
Jim Johnson
|
|
|
This will be ready late A.M. Please call Shane with any questions ###-#### Phone #: ###-#### x238 roof and over flow drains, test ok DWV up to third deck south side of building test ok
|
Plumbing Rough-in | 4/10/2007 | 4/11/2007 | 4/11/2007 | A | PART |
Jim Johnson
|
|
|
This will be ready late A.M. Please call Shane with any questions ###-#### Phone #: ###-#### x238 roof and over flow drain to 3rd floor test ok dwv for bath room area,s test ok note need to change 4 inch cross on horizontal to vertical stack to an approved fitting as per 706.2 2003 upc
|
Water and/or Sewer | 2/6/2007 | 2/7/2007 | 2/7/2007 | A | CANC |
Jim Johnson
|
|
|
If you have questions call Scott @ ###-####. Phone #: ###-#### x0000
|
Roof Drains | 1/15/2007 | 1/16/2007 | 1/16/2007 | A | PART |
Jim Johnson
|
|
|
Underground roof drains. If questions call Shane @ ###-####. Phone #: ###-#### x0000 middle section of roof drain,s test ok ok to cover
|
Groundwork | 1/10/2007 | 1/11/2007 | 1/11/2007 | A | PART |
Jim Johnson
|
|
|
Groundwork, sanitary sewer and roof drains. If questions call Shane @ ###-#### Phone #: ###-#### x0000 partial ground work and roof drains highlighted and dated on approved plan,s in contractor job trailer test ok
|
Groundwork | 12/6/2006 | 12/7/2006 | 12/7/2006 | A | PART |
Jim Johnson
|
|
|
This will be for a partial groundwork. Please call Shane for location ###-####.; Phone #: ###-#### Internet Inspection Request from: Sonja Hankel part ial groundwork highlighted and dated on approved plan,s in building contractor job trailer test ok
|
Water and/or Sewer | 11/6/2006 | 11/7/2006 | 11/7/2006 | A | PART |
Jim Johnson
|
|
|
Please call Shane with any questions ###-####; Phone #: ###-#### Internet Inspection Request from: Sonja water service stub out to five foot of building test ok ok to cover
|