Final | 3/2/2007 | 3/5/2007 | 3/5/2007 | A | PASS |
Daryl Spivey
|
|
|
Please Contact Field Supervisor Sean Hart ###-#### for Final Backflow inspection. Phone #: ###-####
|
Final | 12/15/2006 | 12/15/2006 | 12/15/2006 | A | PART |
Daryl Spivey
|
|
|
Temp occ ok... need to install building Back flow protection....ds
|
Final | 12/12/2006 | 12/13/2006 | 12/13/2006 | A | FAIL |
Daryl Spivey
|
|
|
andrew; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett need to resbmit changes made to plan, flex connector on t&p not permitted, not approved location for T&P and pan drain to drain, no trap primer for drain and needs tempering valves on hand wash sinks....ds
|
Plumbing Rough-in | 10/13/2006 | 10/13/2006 | 10/13/2006 | P | PART |
Daryl Spivey
|
|
|
JT; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt need to strap piping for island better and submit plan changes from approved set...ds
|