Final | 12/19/2006 | 12/20/2006 | 12/20/2006 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/19/2006 at 10:03:40 AM. Contact: ###-####.
|
Final | 12/15/2006 | 12/18/2006 | 12/18/2006 | A | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 12/15/2006 at 3:44:04 PM. Contact: ###-####.caulk all fixtures, adjust mixing valve on hand sink in kitchen area, fix leak on mens room lav.
|
Plumbing Rough-in | 12/5/2006 | 12/6/2006 | 12/6/2006 | A | PASS |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 12/5/2006 at 3:01:56 PM. Contact: ###-####.
|
Plumbing Rough-in | 11/16/2006 | 11/17/2006 | 11/17/2006 | A | CANC |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 11/16/2006 at 11:36:27 AM. Contact: ###-####.
|
Groundwork | 11/17/2006 | 11/17/2006 | 11/17/2006 | A | PASS |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 11/16/2006 at 11:36:27 AM. Contact: ###-####.
|