Final | 6/1/2007 | 6/1/2007 | 6/1/2007 | P | PASS |
Daryl Spivey
|
|
|
blake ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
Final | 5/31/2007 | 5/31/2007 | 5/31/2007 | P | NR |
Daryl Spivey
|
|
|
Brian; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt
|
Final | 5/30/2007 | 5/30/2007 | 5/30/2007 | P | PART |
Daryl Spivey
|
|
|
Need to install 2 rp's for washer...Bill Thompson.....ds
|
Final | 5/24/2007 | 5/25/2007 | 5/25/2007 | A | PART |
Daryl Spivey
|
|
|
bryan ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith temp occ ok....need to install b/f protection on washer....ds
|
Final | 5/1/2007 | 5/2/2007 | 5/2/2007 | A | PART |
Daryl Spivey
|
|
|
Brian Partial on east wing; Phone #: ###-#### Internet Inspection Request from: Andrea Whiteman 15 rooms on east with office area completed ok....ds
|
Water and/or Sewer | 5/1/2007 | 5/1/2007 | 5/1/2007 | P | PASS |
Daryl Spivey
|
|
|
Brian; Phone #: ###-#### Internet Inspection Request from: Andrea Whiteman water service from meter to building....ds
|
Water and/or Sewer | 4/16/2007 | 4/16/2007 | 4/16/2007 | P | PASS |
Eric Strole
|
|
|
bryan ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith-under ground west wing pass.
|
Groundwork | 4/9/2007 | 4/9/2007 | 4/9/2007 | A | PART |
Daryl Spivey
|
|
|
|
Water and/or Sewer | 3/28/2007 | 3/29/2007 | 3/29/2007 | A | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 3/28/2007 at 1:46:08 PM. Contact: ###-####. Waste line down west hall good to cover...ds
|
Groundwork | 3/21/2007 | 3/21/2007 | 3/21/2007 | A | PASS |
Daryl Spivey
|
|
|
6" from back door to tie in in alley with C/O....ds
|
Groundwork | 3/13/2007 | 3/13/2007 | 3/13/2007 | P | PART |
Daryl Spivey
|
|
|
ben; Phone #: ###-#### Internet Inspection Request from: Victoria Beall Water line on east side passed...ds
|
Groundwork | 3/6/2007 | 3/6/2007 | 3/6/2007 | P | PART |
Daryl Spivey
|
|
|
Ben; Phone #: ###-#### Internet Inspection Request from: Stacie Backus east side waste ok...ds
|
Plumbing Rough-in | 2/28/2007 | 2/28/2007 | 2/28/2007 | A | PEND |
Daryl Spivey
|
|
|
sewer line replacing old sewr trunk in side bld......ds
|
Plumbing Rough-in | 2/22/2007 | 2/22/2007 | 2/22/2007 | P | PART |
Bill VanDegrift
|
|
|
bryan Note: lounge; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles dwv test in the lounge ok
|
Groundwork | 2/15/2007 | 2/15/2007 | 2/15/2007 | P | PASS |
Daryl Spivey
|
|
|
ben - partial ground in the lounge; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
Plumbing Rough-in | 2/9/2007 | 2/9/2007 | 2/9/2007 | P | PART |
Eric Strole
|
|
|
###-#### Jannett -south side ground work ok, still need to tie in existing drain line into ground work, will have copper to put in slab, 2nd flr rough-in ok.
|
Water and/or Sewer | 1/19/2007 | 1/19/2007 | 1/19/2007 | P | CANC |
Daryl Spivey
|
|
|
brian ###-####
|
Plumbing Rough-in | 1/19/2007 | 1/19/2007 | 1/19/2007 | P | PART |
Daryl Spivey
|
|
|
brian ###-#### East-west section, top and bottom R/I OK...DS
|
Plumbing Rough-in | 12/28/2006 | 12/28/2006 | 12/28/2006 | P | PART |
Daryl Spivey
|
|
|
partial R/I for 2nd floor. Need to protect water for showers on 2nd fl. from freezing. Still a few rooms on 1st fl west end to R/I. All R/I at this point is on west wing......ds
|
Other | 12/26/2006 | 12/26/2006 | 12/26/2006 | P | PASS |
Daryl Spivey
|
|
|
conference with brian.....
|
Plumbing Rough-in | 12/19/2006 | 12/19/2006 | 12/20/2006 | P | PART |
Daryl Spivey
|
|
|
G/W ok on s.w. corner, 4 rm on other side of hall ok and R/I ok in walls of sw corner ( 6 rms ) ......ds
|
Plumbing Rough-in | 12/13/2006 | 12/13/2006 | 12/13/2006 | P | PART |
Daryl Spivey
|
|
|
Need partcial rough-in inspection on rooms 1-7. Questions call Brian Anderson ###-#### ; Phone #: ###-#### Internet Inspection Request from: Jannette Soden g/w tested ok...ds
|