Plumbing Rough-in | 5/3/2007 | 5/3/2007 | 5/3/2007 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 5/3/2007 at 7:59:40 AM. Contact: ###-####. this was a final ok
|
Final | 5/3/2007 | 5/3/2007 | 5/3/2007 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 5/3/2007 at 7:59:40 AM. Contact: ###-####. final ok
|
Plumbing Rough-in | 2/5/2007 | 2/6/2007 | 2/6/2007 | A | PASS |
Daryl Spivey
|
|
|
robert ###-#### Note: please call 1 hr prior to inspection to meet on job Scheduled by a contractor via Hello! on 2/5/2007 at 4:39:40 PM. Contact: ###-####.
|
Plumbing Rough-in | 2/5/2007 | 2/5/2007 | 2/5/2007 | P | FAIL |
Eric Strole
|
|
|
Rob Please call before going out for key; Phone #: ###-#### Internet Inspection Request from: Darla Downs-needs to test dwv, need some one here for inspection.
|