Final | 9/13/2007 | 9/13/2007 | 9/13/2007 | P | PASS |
Daryl Spivey
|
|
|
There will be people there working all day so it''s accesible for inspector Phone #: ###-#### Internet Inspection Request from: Penny Smith
|
Other | 8/13/2007 | 8/14/2007 | 8/14/2007 | A | PEND |
Eric Strole
|
|
|
sewer line Eric Strole knows about this inspection request. Questions contact Dennis ###-####-need to find out with hard rock if house can be gravity drained. will call dennis when we have an answer. Phone #: ###-#### Internet Inspection Request from: Penny Smith
|
Plumbing Rough-in | 7/18/2007 | 7/19/2007 | 7/19/2007 | P | PASS |
Daryl Spivey
|
|
|
Remodel..ready after 12pm Phone #: ###-#### Internet Inspection Request from: Penny Smith
|
Plumbing Rough-in | 7/18/2007 | 7/18/2007 | 7/18/2007 | P | CANC |
Daryl Spivey
|
|
|
remodel Phone #: ###-#### Internet Inspection Request from: Penny Smith Inspection cancelled from web by: Penny Smith
|
Plumbing Rough-in | 7/17/2007 | 7/18/2007 | 7/18/2007 | A | CANC |
Daryl Spivey
|
|
|
REMODEL ROUGH IN Phone #: ###-#### Internet Inspection Request from: Penny Smith Inspection cancelled from web by: Penny Smith
|
Groundwork | 5/21/2007 | 5/21/2007 | 5/21/2007 | P | PASS |
Daryl Spivey
|
|
|
Ground work had to be redone due to house was sitting aprox 4 feet off from where it was suppose to be..therefore we need another ground work inspection Phone #: ###-#### Internet Inspection Request from: Penny Smith
|
Groundwork | 2/14/2007 | 2/14/2007 | 2/14/2007 | P | PASS |
Daryl Spivey
|
|
|
Ground work reinspection Phone #: ###-####
|
Groundwork | 2/13/2007 | 2/13/2007 | 2/13/2007 | P | FAIL |
Daryl Spivey
|
|
|
Inspection will be ready after 12:30pm Phone #: ###-#### needs backwater valve installed for basement fixtures and sewer for next door residence needs moved off of lot....ds
|