Final | 5/7/2007 | 5/7/2007 | 5/7/2007 | A | PASS |
Eric Strole
|
|
|
|
Final | 5/7/2007 | 5/7/2007 | 5/7/2007 | P | CANC |
Daryl Spivey
|
|
|
dave - norco certificate ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
Final | 5/1/2007 | 5/3/2007 | 5/4/2007 | P | PART |
Bill VanDegrift
|
|
|
josh; Phone #: ###-#### Internet Inspection Request from: Victoria Beall provide avb downstrean of solinoid valve. provide med gas certification. temp occ ok.
|
Final | 5/1/2007 | 5/1/2007 | 5/1/2007 | P | CANC |
Bill VanDegrift
|
|
|
joshua ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith Inspection cancelled from web by: Victoria Beall
|
Med/Gas Systems | 4/24/2007 | 4/25/2007 | 4/25/2007 | A | PASS |
Bill VanDegrift
|
|
|
med gas and ri ok
|
Med/Gas Systems | 4/24/2007 | 4/24/2007 | 4/24/2007 | A | PART |
Bill VanDegrift
|
|
|
start 24 hour test on the compressed air system 149 psi, marked with blue pen.
|
Med/Gas Systems | 4/23/2007 | 4/23/2007 | 4/23/2007 | P | FAIL |
Eric Strole
|
|
|
Call Kirk and he will meet you on the site. Phone #: ###-#### Internet Inspection Request from: Kirk Johns-med air test failed.
|
Med/Gas Systems | 4/20/2007 | 4/23/2007 | 4/23/2007 | A | PART |
Eric Strole
|
|
|
med air failed, vac pass, plumber will call when ready for retest on med air. DO NOT COVER.
|
Med/Gas Systems | 4/19/2007 | 4/20/2007 | 4/20/2007 | A | PART |
Eric Strole
|
|
|
this was the start of 24 hr test on air & vac system.
|
Med/Gas Systems | 4/19/2007 | 4/19/2007 | 4/19/2007 | P | FAIL |
Eric Strole
|
|
|
Pressure witness test. Phone #: ###-#### Internet Inspection Request from: Kirk Johns-need to support air line every 6'- need to support vac line every 4'- vac line needs graded 1/4" every 10'- need 150 psi on air & 15 psi on vac for 24 hr test- need stamped drawing for vac & air before final.
|
Plumbing Rough-in | 3/21/2007 | 3/21/2007 | 3/21/2007 | P | PART |
Eric Strole
|
|
|
dwv & water pass, ok to cover walls that will not effect vac & air line system that still need installed & tested.
|
Plumbing Rough-in | 3/21/2007 | 3/22/2007 | 3/21/2007 | A | CANC |
Eric Strole
|
|
|
kirk; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
Plumbing Rough-in | 3/20/2007 | 3/21/2007 | 3/21/2007 | P | CANC |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 3/20/2007 at 3:37:22 PM.
|
Plumbing Rough-in | 3/13/2007 | 3/13/2007 | 3/13/2007 | P | PART |
Eric Strole
|
|
|
Kirk; Phone #: ###-#### Internet Inspection Request from: Stacie Backus-dwv & water pass, still need air & vac line's tested & sleeved.
|