Final | 10/18/2007 | 10/18/2007 | 10/18/2007 | P | PASS |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 10/18/2007 at 8:35:01 AM. Contact: ###-####.toilets need to be pulled & reset when they tile, as per conversation with tom miller with level 3 development there will be another plumbing company doing this work.
|
Final | 10/2/2007 | 10/2/2007 | 10/2/2007 | P | NR |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 10/2/2007 at 10:12:37 AM. Contact: ###-####.
|
PLM-Aging Inspection | 10/2/2007 | 10/2/2007 | 10/2/2007 | | PASS |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 7/23/2007 | 7/23/2007 | 7/24/2007 | | PASS |
Eric Strole
|
|
|
|
Plumbing Rough-in | 5/9/2007 | 5/9/2007 | 5/9/2007 | P | PASS |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 5/9/2007 at 8:47:32 AM. Contact: ###-####.
|
Groundwork | 4/24/2007 | 4/24/2007 | 4/24/2007 | P | PASS |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 4/24/2007 at 8:40:09 AM. Contact: ###-####.-g/w & water & sewer pass.
|
Groundwork | 3/23/2007 | 3/23/2007 | 3/23/2007 | P | CANC |
Eric Strole
|
|
|
###-####-need to post address
|