Sprinkler (Final) | 5/18/2007 | 5/18/2007 | 5/18/2007 | P | PASS |
Eric Strole
|
|
|
|
Sprinkler (Final) | 5/17/2007 | 5/17/2007 | 5/17/2007 | P | FAIL |
Eric Strole
|
|
|
blowout tee needs to be upstream of dbcv,need 2 hose clamps on each fitting,hose clamps need to be 180 degree's from each other.
|
Sprinkler (Final) | 5/15/2007 | 5/15/2007 | 5/15/2007 | A | FAIL |
Eric Strole
|
|
|
|
Sprinkler (Final) | 5/14/2007 | 5/14/2007 | 5/14/2007 | P | FAIL |
Eric Strole
|
|
|
ryan; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
Sprinkler (Final) | 4/25/2007 | 4/25/2007 | 4/25/2007 | P | FAIL |
Eric Strole
|
|
|
ryan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles-uncover work for inspection.
|