Final | 6/27/2008 | 6/27/2008 | 6/27/2008 | P | PASS |
Eric Strole
|
|
|
PLEASE USE THAYNE AS CONTACT, THANK YOU. Phone #: ###-#### Internet Inspection Request from: JENN STALEY
|
Final | 6/18/2008 | 6/18/2008 | 6/18/2008 | P | PART |
Eric Strole
|
|
|
PLEASE USE THAYNE AS CONTACT, THANK YOU. Phone #: ###-#### Internet Inspection Request from: JENN STALEY-install rpba on dishwasher, all equipment with water and/ or drains shall be hooked up by a plumbing contractor, cap off all unused water lines in kitchen area, need traps on indirect waste over 5' , need grates on flr sinks in traffic area's, label all backflow devices. (temp final ok)
|
Final | 4/28/2008 | 4/28/2008 | 4/28/2008 | P | PART |
Eric Strole
|
|
|
temp final ok to move equipment into classrooms only.
|
Final | 4/25/2008 | 4/28/2008 | 4/28/2008 | A | CANC |
Eric Strole
|
|
|
PLEASE USE THAYNE AS CONTACT, THANK YOU. Phone #: ###-#### Internet Inspection Request from: JENN STALEY
|
PLM-Aging Inspection | 3/20/2008 | 3/20/2008 | 3/20/2008 | | PASS |
Eric Strole
|
|
|
wip
|
Plumbing Rough-in | 1/14/2008 | 1/15/2008 | 1/15/2008 | A | PART |
Eric Strole
|
|
|
PLEASE USE THAYNE AS CONTACT, THANK YOU. Phone #: ###-#### Internet Inspection Request from: JENN STALEY-kitchen rough-in pass, need to find leak on water, need vents extended thru roof & mech room rough-in.
|
Plumbing Rough-in | 1/4/2008 | 1/4/2008 | 1/4/2008 | P | PART |
Eric Strole
|
|
|
PLEASE USE THAYNE AS CONTACT, THANK YOU. Phone #: ###-#### Internet Inspection Request from: JENN STALEY-bathrooms complete, need kitchen rough-in & corrections from previous notes.
|
Plumbing Rough-in | 12/18/2007 | 12/18/2007 | 12/18/2007 | P | PART |
Eric Strole
|
|
|
JOB CONTACT IS THAYNE HILL Phone #: ###-#### Internet Inspection Request from: ADAM WARR-bathrooms 48 & 49 & kitchen area need completed for rough-in & find & fix leak on water in area b-south side & reverse grade on trap arms in block walls.
|
Plumbing Rough-in | 12/10/2007 | 12/10/2007 | 12/10/2007 | P | PART |
Daryl Spivey
|
|
|
PLEASE USE THAYNE AS CONTACT. THANK YOU. Phone #: ###-#### Internet Inspection Request from: JENN STALEY c area tested ok (just for kids).....ds
|
Plumbing Rough-in | 11/6/2007 | 11/6/2007 | 11/6/2007 | P | PART |
Eric Strole
|
|
|
area b dwv & water, area c except just for kids & large bath in area a test pass, still need to make all other corrections from am inspection on 11-6-07.
|
Plumbing Rough-in | 11/5/2007 | 11/6/2007 | 11/6/2007 | A | PART |
Eric Strole
|
|
|
JOB CONTACT IS THAYNE HILL Phone #: ###-#### Internet Inspection Request from: ADAM WARR-retest sections of dwv, find & fix water leak on south side-area b. protect all water lines in block wall, fix reverse grade on all trap arms. ok to insulate water lines. this is for areas complete only, there are sections of dwv & water that need to be roughed-in & tested.
|
Other | 11/1/2007 | 11/1/2007 | 11/1/2007 | P | CANC |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 10/10/2007 | 10/12/2007 | 10/12/2007 | A | PASS |
Jim Johnson
|
|
|
project under construction
|
PLM-Aging Inspection | 10/10/2007 | 10/10/2007 | 10/10/2007 | | CANC |
Lee Rice
|
|
|
|
Plumbing Rough-in | 8/8/2007 | 8/9/2007 | 8/9/2007 | P | PART |
Eric Strole
|
|
|
this was a partial wall inspection.
|
Plumbing Rough-in | 7/20/2007 | 7/23/2007 | 7/23/2007 | A | PART |
Bill VanDegrift
|
|
|
vent extentions
|
Plumbing Rough-in | 7/20/2007 | 7/20/2007 | 7/20/2007 | P | CANC |
Eric Strole
|
|
|
CONTACT: THAYNE HILL Phone #: ###-#### Internet Inspection Request from: JENN STALEY
|
Plumbing Rough-in | 7/18/2007 | 7/19/2007 | 7/19/2007 | A | PART |
Eric Strole
|
|
|
this is partial wall inspection on dwv & water in block wall, south west area ok-all above ground dwv & water still needs tested.
|
Plumbing Rough-in | 7/18/2007 | 7/18/2007 | 7/18/2007 | P | FAIL |
Eric Strole
|
|
|
CONTACT: THAYNE HILL Phone #: ###-#### Internet Inspection Request from: JENN STALEY-need to change no hub bands to mission couplings on pvc to cast iron .
|
Groundwork | 6/29/2007 | 6/29/2007 | 6/29/2007 | A | PART |
Eric Strole
|
|
|
GREASE TANK INSPECTION, JOB CONTACT THAYNE Phone #: ###-#### Internet Inspection Request from: ADAM WARR-grease trap pass
|
Groundwork | 6/27/2007 | 6/28/2007 | 6/29/2007 | A | PART |
Eric Strole
|
|
|
GREASE TANK INSPECTION; JOB CONTACT THAYNE Phone #: ###-#### Internet Inspection Request from: ADAM WARR-inlet & outlet piping on grease trap pass-grease trap still needs to be tested.grease trap pass
|
Groundwork | 6/21/2007 | 6/21/2007 | 6/21/2007 | P | PART |
Lee Rice
|
|
|
CONTACT: THAYNE Phone #: ###-#### Internet Inspection Request from: JENN STALEY...left general message....repair leak and call back.
|
Groundwork | 6/20/2007 | 6/20/2007 | 6/20/2007 | P | PART |
Eric Strole
|
|
|
JOB CONTACT IS THAYNE HILL, HOWEVER USING KELLY MUNRO''S PHONE NUMBER Phone #: ###-#### Internet Inspection Request from: KYLIE HICKS-erea b,c south west bathroom group pass.
|
Groundwork | 6/14/2007 | 6/15/2007 | 6/15/2007 | P | PART |
Eric Strole
|
|
|
JOB CONTACT IS THAYNE Phone #: ###-#### Internet Inspection Request from: ADAM WARR-trunk line on drainage in area b & c pass, ok to cover.
|
Groundwork | 6/13/2007 | 6/14/2007 | 6/14/2007 | A | PART |
Eric Strole
|
|
|
CONTACT: THAYNE HILL Phone #: ###-#### Internet Inspection Request from: JENN STALEY-ground work in mech room pass.
|
Groundwork | 6/11/2007 | 6/11/2007 | 6/11/2007 | A | PART |
Eric Strole
|
|
|
JOB CONTACT THAYNE HILL Phone #: ###-#### Internet Inspection Request from: ADAM WARR-section a drains complete except 10 branch drains to sinks, will complete after footings are dug.
|
Groundwork | 6/4/2007 | 6/4/2007 | 6/4/2007 | P | PART |
Eric Strole
|
|
|
this was to check bedding for g/w.
|
Groundwork | 6/4/2007 | 6/4/2007 | 6/4/2007 | A | PART |
Eric Strole
|
|
|
area groumd work-trunk line & 7 bathrooms pass,still need branch drains on sinks & 3 more bathrooms,need snack room sink to drain into flr sink.ok to cover these areas. still need grease waste.
|
Groundwork | 6/1/2007 | 6/4/2007 | 6/1/2007 | A | CANC |
Eric Strole
|
|
|
JOB CONTACT IS THAYNE Phone #: ###-#### Internet Inspection Request from: KYLIE HICKS Inspection cancelled from web by: KYLIE HICKS
|
Other | 5/15/2007 | 5/16/2007 | 5/16/2007 | A | DONE |
Eric Strole
|
|
|
please contact Thayne for conference ###-#### Internet Inspection Request from: John Buss-this was a conferance on space needed in toilet stalls, talking to job general sounds like they will make the 2 -8" block walls 6" block walls, this should make stalls closer to 30".
|
Water and/or Sewer | 5/1/2007 | 5/1/2007 | 5/1/2007 | A | PART |
Eric Strole
|
|
|
sewer pass.
|
Groundwork | 4/30/2007 | 5/1/2007 | 5/1/2007 | A | PART |
Eric Strole
|
|
|
please contact thayne ###-####, thank you Internet Inspection Request from: John Buss-water line stub into building pass.
|