Final | 11/21/2007 | 11/21/2007 | 11/21/2007 | P | PASS |
Gerry Varner
|
|
|
Call CArlos. ###-#### Phone #: ###-#### Internet Inspection Request from: raul castanon --- install dble speedy stop and serve sink and dishwasher with seprate lines.
|
Water and/or Sewer | 10/19/2007 | 10/19/2007 | 10/19/2007 | P | CANC |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 10/19/2007 at 9:51:41 AM. Contact: ###-####.
|
Plumbing Rough-in | 9/12/2007 | 9/13/2007 | 9/13/2007 | A | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### Internet Inspection Request from: raul castanon office area ri ok everything else is exposed
|
Plumbing Rough-in | 9/12/2007 | 9/12/2007 | 9/12/2007 | P | PART |
Gerry Varner
|
|
|
Raul Phone #: ###-#### Internet Inspection Request from: raul castanon WASTE- VENTS- WATER LINES OK - NEED A FEW NAIL PLATES - AND TEST ON W&V.
|
Water and/or Sewer | 7/27/2007 | 7/30/2007 | 7/30/2007 | A | PASS |
Bill VanDegrift
|
|
|
8ish also talked to american paving about storm drain inspection requirements.
|
Water and/or Sewer | 7/27/2007 | 7/30/2007 | 7/30/2007 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 7/27/2007 at 12:00:08 PM. Contact: ###-####. interceptor test and piping ok.
|
Water and/or Sewer | 7/27/2007 | 7/27/2007 | 7/27/2007 | P | NR |
Bill VanDegrift
|
|
|
|
Groundwork | 6/6/2007 | 6/7/2007 | 6/7/2007 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 6/6/2007 at 2:36:33 PM. Contact: ###-####. trench drain piping north side of the shop ok to cover.
|
Groundwork | 6/7/2007 | 6/7/2007 | 6/7/2007 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 6/6/2007 at 2:36:33 PM. Contact: ###-####.
|
Groundwork | 6/7/2007 | 6/7/2007 | 6/7/2007 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 6/6/2007 at 2:36:33 PM. Contact: ###-####. test failed
|
Groundwork | 6/5/2007 | 6/5/2007 | 6/5/2007 | P | PASS |
Bill VanDegrift
|
|
|
recieved letter from engineer about not installing traps and vents on the trench drains.
|
Groundwork | 6/4/2007 | 6/4/2007 | 6/5/2007 | P | FAIL |
Bill VanDegrift
|
|
|
carlos - pls call for access code; Phone #: ###-#### Internet Inspection Request from: Victoria Beall no corrections made
|
Groundwork | 5/30/2007 | 5/31/2007 | 5/31/2007 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 5/30/2007 at 2:43:42 PM. Contact: ###-####. traps and vents required on the trench drains per approved plans and 2003 upc. pending completion of the resubmittal process.
|
Groundwork | 5/18/2007 | 5/18/2007 | 5/18/2007 | P | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 5/18/2007 at 7:35:43 AM. Contact: ###-####.partail g/w, south east corner ok.
|
Groundwork | 5/8/2007 | 5/9/2007 | 5/9/2007 | A | PART |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 5/8/2007 at 4:31:08 PM. Contact: ###-####.sanitary ground work complete,pass.
|
Groundwork | 5/7/2007 | 5/7/2007 | 5/7/2007 | P | PART |
Eric Strole
|
|
|
joe - partial under ground; Phone #: ###-#### Internet Inspection Request from: Victoria Beall-sanitary drains on g/w except bath at elevetor pass, still need fuel intercepter g/w.
|