Final | 2/15/2008 | 2/15/2008 | 2/15/2008 | A | PASS |
Daryl Spivey
|
|
|
|
Water and/or Sewer | 2/14/2008 | 2/15/2008 | 2/15/2008 | A | CANC |
Daryl Spivey
|
|
|
|
Final | 2/14/2008 | 2/14/2008 | 2/14/2008 | P | CANC |
Daryl Spivey
|
|
|
|
Final | 2/6/2008 | 2/6/2008 | 2/6/2008 | P | PART |
Daryl Spivey
|
|
|
frank Phone #: ###-#### tub on back order......ok to final........will final plg when tub is installed........ds
|
Plumbing Rough-in | 8/16/2007 | 8/16/2007 | 8/16/2007 | P | PASS |
Eric Strole
|
|
|
FRANK Phone #: ###-####-need to ajust fixture count.
|
Plumbing Rough-in | 6/1/2007 | 6/1/2007 | 6/1/2007 | P | CANC |
Daryl Spivey
|
|
|
Frank ###-####
|
Groundwork | 6/1/2007 | 6/1/2007 | 6/1/2007 | P | PASS |
Daryl Spivey
|
|
|
Frank ###-####
|