DOC - Permit Finaled | | | 10/11/2007 | | |
|
|
|
Per Lee Rice ok to final permit per company started job but other contractor finished//10/11/07 LEG
|
Final | 9/27/2007 | 9/28/2007 | 9/28/2007 | A | DONE |
Eric Strole
|
|
|
this was a conferance.
|
Final | 9/24/2007 | 9/25/2007 | 9/25/2007 | A | FAIL |
Eric Strole
|
|
|
daniel Phone #: ###-#### - ///9-27-07 eric strole called in and changed it from pass to fail
|
Groundwork | 6/21/2007 | 6/22/2007 | 6/22/2007 | A | PART |
Lee Rice
|
|
|
joe Phone #: ###-####......ok to cover floor and walls....will need to change 2 inch in basement at glass washer drain and 3 comp to 3 inch down stream before next inspection.. exceeded FU loading at that point.
|