Final | 9/7/2007 | 9/7/2007 | 9/7/2007 | P | PASS |
Jim Johnson
|
|
|
This is re-inspection of final Phone #: ###-#### Internet Inspection Request from: Randy Calkins
|
Final | 9/5/2007 | 9/6/2007 | 9/6/2007 | A | PART |
Jim Johnson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Randy Calkins need 120 degree hot water to hand sink,s may need additional backflow to ice machine on soda fountain need to caulk all fixture to wall in kitchen area need one inch air gap on dishwashing machine need to have sign off card on site called contractor will recall when ready
|
Plumbing Rough-in | 7/9/2007 | 7/10/2007 | 7/10/2007 | P | PASS |
Eric Strole
|
|
|
Above slab rough in inspection Phone #: ###-#### Internet Inspection Request from: Randy Calkins
|
Groundwork | 6/20/2007 | 6/21/2007 | 6/21/2007 | A | PASS |
Lee Rice
|
|
|
Phone #: ###-#### Internet Inspection Request from: Randy Calkins
|