Final | 8/27/2007 | 8/28/2007 | 8/28/2007 | P | PASS |
Gerry Varner
|
|
|
Phone #: ###-#### Internet Inspection Request from: Scott Hurren
|
Final | 8/21/2007 | 8/22/2007 | 8/22/2007 | A | PART |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 8/21/2007 at 4:05:34 PM. Contact: ###-####. set lav. shower valve handle shower strainer caulk tub spout.
|
Plumbing Rough-in | 6/25/2007 | 6/25/2007 | 6/25/2007 | P | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### Internet Inspection Request from: Scott Hurren
|
Plumbing Rough-in | 6/20/2007 | 6/22/2007 | 6/22/2007 | P | NR |
Bill VanDegrift
|
|
|
Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
|