Sprinkler (Final) | 7/13/2007 | 7/13/2007 | 7/13/2007 | P | PASS |
Bill VanDegrift
|
|
|
|
Sprinkler (Final) | 7/6/2007 | 7/6/2007 | 7/9/2007 | P | PART |
Jim Johnson
|
|
|
after 2 need to have double check retested and certified talked to sprinkler contractor will recall when ready
|
Sprinkler (Final) | 7/5/2007 | 7/5/2007 | 7/5/2007 | P | FAIL |
Bill VanDegrift
|
|
|
###-#### Teresa expose tie in to water service. shutoff valve with #1 test port goes upstream of dcva, switch valves and retest.
|