Final | 11/7/2007 | 11/8/2007 | 11/8/2007 | A | PASS |
Jim Johnson
|
|
|
josh Phone #: ###-####
|
Plumbing Rough-in | 11/1/2007 | 11/1/2007 | 11/1/2007 | P | PASS |
Eric Strole
|
|
|
josh Phone #: ###-####-last vent for coolers pass.
|
Groundwork | 10/9/2007 | 10/9/2007 | 10/9/2007 | P | PART |
Jim Johnson
|
|
|
josh Phone #: ###-#### ground work behind milk case ok ok to cover
|
Final | 10/8/2007 | 10/8/2007 | 10/8/2007 | P | PART |
Jim Johnson
|
|
|
josh Phone #: ###-#### need to provide strainer,s for all floor sink,s caulk all fixtures have all soap and chemical dispenser,s installed
|
Groundwork | 10/4/2007 | 10/4/2007 | 10/4/2007 | P | PART |
Jim Johnson
|
|
|
josh Phone #: ###-#### last set of case drain,s test ok
|
Plumbing Rough-in | 10/2/2007 | 10/2/2007 | 10/2/2007 | P | PART |
Jim Johnson
|
|
|
josh Phone #: ###-####
|
Plumbing Rough-in | 9/27/2007 | 9/27/2007 | 9/27/2007 | P | PART |
Jim Johnson
|
|
|
JOSH Phone #: ###-#### back wall on sea food area test ok ok to cover
|
Groundwork | 9/25/2007 | 9/25/2007 | 9/25/2007 | P | PART |
Jim Johnson
|
|
|
josh Phone #: ###-#### ground work on south wall in sea food area DWV test ok
|
Groundwork | 9/24/2007 | 9/24/2007 | 9/24/2007 | P | PASS |
Jim Johnson
|
|
|
josh - re-inspection Phone #: ###-#### sea food area DWV groundwok test ok
|
Groundwork | 9/21/2007 | 9/21/2007 | 9/21/2007 | P | PART |
Jim Johnson
|
|
|
Josh; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ground work in sea food area drain,s on west side of case test ok test on east side of case test failed need to retest
|
Groundwork | 9/17/2007 | 9/17/2007 | 9/17/2007 | P | PART |
Eric Strole
|
|
|
josh Phone #: ###-####-relocation of case drains on existing system pass.
|
Groundwork | 9/13/2007 | 9/13/2007 | 9/13/2007 | P | PART |
Bill VanDegrift
|
|
|
josh Phone #: ###-#### upper end of the case drains ok.
|
Groundwork | 9/12/2007 | 9/12/2007 | 9/12/2007 | P | PART |
Eric Strole
|
|
|
josh; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt-section of g/w complete.
|
Groundwork | 9/12/2007 | 9/12/2007 | 9/12/2007 | P | CANC |
Eric Strole
|
|
|
|
Groundwork | 9/11/2007 | 9/11/2007 | 9/11/2007 | P | PART |
Eric Strole
|
|
|
josh; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt-section of drains by registers pass.
|
Final | 8/31/2007 | 8/31/2007 | 8/31/2007 | P | PART |
Eric Strole
|
|
|
josh ###-####-need to hook up water to 3 compartment sink in bakery. temp ok.
|
Final | 8/27/2007 | 8/27/2007 | 8/27/2007 | P | PART |
Eric Strole
|
|
|
craig - pharmacy Phone #: ###-####-temp ok, needs tempered water to lav-will check on next inspection.
|
Groundwork | 8/22/2007 | 8/22/2007 | 8/22/2007 | P | PART |
Eric Strole
|
|
|
josh Phone #: ###-####-section of hub drains in produce section on ground work pass.
|
Other | 8/16/2007 | 8/17/2007 | 8/17/2007 | A | DONE |
Eric Strole
|
|
|
Please drop off correction notice for rp''s and double checks in deli area. Phone #: ###-#### Internet Inspection Request from: Kirk Johns
|
Groundwork | 8/10/2007 | 8/10/2007 | 8/10/2007 | P | PART |
Eric Strole
|
|
|
josh Phone #: ###-####-pharmacy ground work & rough-in pass.
|
Groundwork | 8/7/2007 | 8/7/2007 | 8/7/2007 | P | PART |
Eric Strole
|
|
|
josh Phone #: ###-####-drains and water in produce center pass, still need to run vent for system.
|
Final | 8/3/2007 | 8/6/2007 | 8/6/2007 | A | PART |
Eric Strole
|
|
|
(this is for the deli)need to remove all componets related to garbage disposal, fernco's are approved below ground only. temp final ok.
|
Final | 8/3/2007 | 8/3/2007 | 8/3/2007 | P | PART |
Eric Strole
|
|
|
need to delete garbage disposal on 3 compartment sink,need dbcv on water machine, need to seperate exspresso & ice machine in tully's coffee with dbcv on ice & rpba on exspresso,need rpba on steam ovens & dishwasher, need dbcv on hose reel & rotisserie.
|
Final | 8/2/2007 | 8/3/2007 | 8/3/2007 | A | CANC |
Eric Strole
|
|
|
|
Final | 8/2/2007 | 8/2/2007 | 8/2/2007 | P | DONE |
Eric Strole
|
|
|
greg ###-#### Phone #: ###-####-this was a walk thru with plumber in deli.
|
Plumbing Rough-in | 8/1/2007 | 8/1/2007 | 8/1/2007 | P | PART |
Bill VanDegrift
|
|
|
jake Phone #: ###-#### ri pharmacy and floral
|
Groundwork | 7/31/2007 | 7/31/2007 | 7/31/2007 | P | PART |
Eric Strole
|
|
|
jake ; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang-ground work in pharmacy for bath & break sink pass.
|
Groundwork | 7/30/2007 | 7/30/2007 | 7/30/2007 | P | PART |
Eric Strole
|
|
|
Jake ###-####-ground work in florist area pass.
|
Plumbing Rough-in | 7/17/2007 | 7/17/2007 | 7/17/2007 | P | PART |
Eric Strole
|
|
|
josh Phone #: ###-####-part r/i & g/w in deli & storage area.
|
Plumbing Rough-in | 7/16/2007 | 7/16/2007 | 7/16/2007 | P | NR |
Bill VanDegrift
|
|
|
craig Note: underground/ri Phone #: ###-#### Note: please see the super - criag to get the store room no tests on
|