Final | 9/17/2008 | 9/17/2008 | 9/17/2008 | P | PASS |
Jim Johnson
|
|
|
This will be ready after 1:00pm Please call Efrain with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Plumbing Rough-in | 9/11/2008 | 9/12/2008 | 9/12/2008 | P | PASS |
Jim Johnson
|
|
|
outside drinking fountain
|
Plumbing Rough-in | 9/11/2008 | 9/11/2008 | 9/11/2008 | P | NR |
Jim Johnson
|
|
|
This will be for an outside drinking fountian, please call Omar with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel not ready
|
Plumbing Rough-in | 7/29/2008 | 7/30/2008 | 7/30/2008 | A | PART |
Jim Johnson
|
|
|
This is for a drinking fountain, please call Efrain before you head over there, ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel water line tie in to outside drinking fountain ok ok to cover
|
Final | 7/28/2008 | 7/28/2008 | 7/28/2008 | P | PART |
Jim Johnson
|
|
|
Please call Efrain with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel need to complete installation of outside drinking fountain need to repipe plaster trap,s with approved material and provide room for maintenance on trap need to provide approved backflow assembly on pot filler,s in kitchen area
|
PLM-Aging Inspection | 7/8/2008 | 7/8/2008 | 7/8/2008 | | PASS |
Jim Johnson
|
|
|
|
Final | 5/5/2008 | 5/6/2008 | 5/6/2008 | A | PART |
Jim Johnson
|
|
|
THis will be ready around noon. Please call Efrain with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel walk through with Efrain on restroom,s and class room,s still need to finish kitchen area oked temp.
|
Plumbing Rough-in | 4/3/2008 | 4/4/2008 | 4/4/2008 | A | PASS |
Jim Johnson
|
|
|
This is ready areound noon. Please call Efrain with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel this inspection complete,s rough-in for D W V and water system,s
|
Plumbing Rough-in | 3/19/2008 | 3/20/2008 | 3/20/2008 | P | PART |
Jim Johnson
|
|
|
Please call Efrain for locations ###-####. Phone #: ###-#### Internet Inspection Request from: Sonja Hankel over head water test ok D W V on north west wing test ok
|
Other | 3/13/2008 | 3/14/2008 | 3/14/2008 | A | PART |
Jim Johnson
|
|
|
This will be for a conference, please call Efrain ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel conf. only on premius protection location
|
Water and/or Sewer | 2/27/2008 | 2/29/2008 | 2/29/2008 | A | PART |
Jim Johnson
|
|
|
This is for the main gym area, please call Omar with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel water in over head of gym area test ok
|
Water and/or Sewer | 2/26/2008 | 2/27/2008 | 2/27/2008 | A | PART |
Jim Johnson
|
|
|
Please call Omar with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel note rough-in on water system in boy and girl restroom north of gym area a test ok
|
Water and/or Sewer | 2/25/2008 | 2/26/2008 | 2/26/2008 | A | PART |
Jim Johnson
|
|
|
Kitchen area. If questions call Omar @ ###-####. Phone #: ###-#### x0000 Internet Inspection Request from: Sonja Hankel this inspection is for in wall water in kit area test ok
|
Plumbing Rough-in | 2/21/2008 | 2/22/2008 | 2/22/2008 | A | PART |
Jim Johnson
|
|
|
Please call Omar with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel two drinking fountain,s and mop sink in area A test ok
|
Other | 2/21/2008 | 2/21/2008 | 2/21/2008 | P | PART |
Jim Johnson
|
|
|
This will be a conference at 2:00pm, please call Greg with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel conf only
|
Final | 2/20/2008 | 2/20/2008 | 2/20/2008 | P | CANC |
Jim Johnson
|
|
|
This will be for area J. Please call Bruce with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel Inspection cancelled from web by: Sonja Hankel
|
Plumbing Rough-in | 2/13/2008 | 2/14/2008 | 2/14/2008 | P | PART |
Jim Johnson
|
|
|
Please call Omar with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel kit area D W V and water test ok
|
Plumbing Rough-in | 2/5/2008 | 2/6/2008 | 2/6/2008 | P | PART |
Jim Johnson
|
|
|
Please call Omar with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel rest room,s in area A,B,AND C test ok outside hose bibb,s in kit area test ok
|
Plumbing Rough-in | 1/24/2008 | 1/25/2008 | 1/25/2008 | P | PART |
Jim Johnson
|
|
|
This is for area B. Please call Omar with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel over head water and vent,s in area B test ok
|
Groundwork | 1/21/2008 | 1/22/2008 | 1/22/2008 | P | PART |
Jim Johnson
|
|
|
This is for water, waste, vent for admin. area please call Omar with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel in wall rough-in for rest room,s in admin. area and restroom in area C test ok
|
PLM-Aging Inspection | 12/17/2007 | 12/17/2007 | 12/17/2007 | | PASS |
Jim Johnson
|
|
|
project under construction
|
Groundwork | 10/16/2007 | 10/17/2007 | 10/17/2007 | P | PART |
Jim Johnson
|
|
|
This is for area B. Please call Omar with ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel ground work for area B test ok ok to cover
|
Groundwork | 9/12/2007 | 9/13/2007 | 9/13/2007 | A | PART |
Eric Strole
|
|
|
This is for the kitchen area. Please call Omar with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel-grease waste pass.
|
Groundwork | 9/6/2007 | 9/6/2007 | 9/6/2007 | P | PART |
Eric Strole
|
|
|
This is for the kitchen area. Please call Omar with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel-g/w in kitchen area on sanitary sewer pass.
|
Groundwork | 8/29/2007 | 8/30/2007 | 8/30/2007 | P | PART |
Eric Strole
|
|
|
Please call Omar with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel-section of ground work complete is marked on plans,pass.
|
Groundwork | 8/23/2007 | 8/24/2007 | 8/24/2007 | P | PART |
Eric Strole
|
|
|
Please call Omar with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel-bathrooms in gym pass.
|
Groundwork | 8/17/2007 | 8/20/2007 | 8/20/2007 | A | PART |
Eric Strole
|
|
|
Please call omar with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel-mech room g/w pass, all area's complete are marked on plans in job trailer.
|
Groundwork | 8/14/2007 | 8/15/2007 | 8/15/2007 | A | PART |
Eric Strole
|
|
|
This is for area A. Please call Omar with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel-g/w for area a complete,pass.
|
Groundwork | 8/10/2007 | 8/13/2007 | 8/13/2007 | A | PART |
Eric Strole
|
|
|
Please call Omar with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel-area c ground work pass.(omar will add 4" c/o on bath group on east side, will call when complete.)
|
Groundwork | 8/7/2007 | 8/7/2007 | 8/7/2007 | A | PART |
Eric Strole
|
|
|
section of ground work in area a pass, section complete is marked on plans in job trailer.
|
Water and/or Sewer | 8/6/2007 | 8/7/2007 | 8/7/2007 | A | CANC |
Eric Strole
|
|
|
This is for area A. Please call Omar with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Groundwork | 7/31/2007 | 7/31/2007 | 7/31/2007 | P | PART |
Eric Strole
|
|
|
area a & c dwv trunck line pass & sinks on west side of trunk line. area's complete are marked on plans in job trailer.
|
Groundwork | 7/30/2007 | 7/31/2007 | 7/31/2007 | A | NR |
Eric Strole
|
|
|
Please call Omar with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Groundwork | 7/26/2007 | 7/26/2007 | 7/26/2007 | A | PART |
Bill VanDegrift
|
|
|
interceptor test ok
|
Groundwork | 7/24/2007 | 7/25/2007 | 7/25/2007 | A | PART |
Bill VanDegrift
|
|
|
2nd interceptor test inspection the interceptot test is ok but still needs the test port.
|
Groundwork | 7/23/2007 | 7/24/2007 | 7/24/2007 | A | PART |
Bill VanDegrift
|
|
|
Please call Omar with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel started tank test needs to add a san tee for the test port.
|
Water and/or Sewer | 7/18/2007 | 7/18/2007 | 7/18/2007 | P | PASS |
Eric Strole
|
|
|
2-4" sewer lines, 1-4" grease line & 1 waterline into building pass.
|
Plumbing Rough-in | 7/18/2007 | 7/18/2007 | 7/18/2007 | P | CANC |
Eric Strole
|
|
|
|
Water and/or Sewer | 7/17/2007 | 7/18/2007 | 7/18/2007 | P | CANC |
Eric Strole
|
|
|
Partial waste and water. If questions please call Omar @ ###-####. Phone #: ###-#### x0000 Internet Inspection Request from: Sonja Hankel
|