Final | 9/7/2007 | 9/10/2007 | 9/10/2007 | A | PASS |
Jim Johnson
|
|
|
|
Final | 9/7/2007 | 9/7/2007 | 9/7/2007 | P | PART |
Jim Johnson
|
|
|
PLEASE USE JEFF S. AS THE CONTACT. THANK YOU. Phone #: ###-#### Internet Inspection Request from: JENN STALEY need to make walk through with Bill T. with united water monday 9/10/07 on boiler water make up
|
Plumbing Rough-in | 7/27/2007 | 7/30/2007 | 7/30/2007 | A | PASS |
Eric Strole
|
|
|
THIS IS A RE-INSPECTION, JOB CONTACT IS DALE BICKFORD Phone #: ###-#### Internet Inspection Request from: KYLIE HICKS
|
Groundwork | 7/26/2007 | 7/26/2007 | 7/26/2007 | P | FAIL |
Bill VanDegrift
|
|
|
needs a dcva on both water services upstream of any branches. 2" min. clothes washer trap required. provide a hub drain for the blowdown tank r.p. thermol expantion tank required on both services.
|
Plumbing Rough-in | 7/25/2007 | 7/26/2007 | 7/26/2007 | A | NR |
Eric Strole
|
|
|
JOB CONTACT IS ALLEN DIXON; THE BUILDING MAY BE LOCKED. IF IT IS LOCKED THE KEY WILL BE LOCATED INSIDE DISCRETE SECRETS. Phone #: ###-#### Internet Inspection Request from: ADAM WARR
|