Final | 1/31/2008 | 1/31/2008 | 1/31/2008 | P | PASS |
Eric Strole
|
|
|
|
Final | 1/30/2008 | 1/31/2008 | 1/31/2008 | A | FAIL |
Eric Strole
|
|
|
mike Phone #: ###-####-need to repipe kitchen sink, need to install water heater pan, need to pipe t & p.
|
Final | 1/25/2008 | 1/25/2008 | 1/25/2008 | P | DONE |
Eric Strole
|
|
|
Mike Phone #: ###-####//Not Ready per phone call from Mike Cook on 1-25-08 @ 9:00am BAS
|
Plumbing Rough-in | 9/21/2007 | 9/21/2007 | 9/21/2007 | P | PASS |
Eric Strole
|
|
|
|
Plumbing Rough-in | 9/20/2007 | 9/20/2007 | 9/20/2007 | P | FAIL |
Eric Strole
|
|
|
dwv test failed, need to finish rough in of laundry sink.
|
Plumbing Rough-in | 9/20/2007 | 9/21/2007 | 9/20/2007 | A | CANC |
Eric Strole
|
|
|
mike Phone #: ###-####
|
Water and/or Sewer | 8/24/2007 | 8/24/2007 | 8/24/2007 | P | PASS |
Jim Johnson
|
|
|
water line outside only test ok
|