Final | 11/19/2007 | 11/20/2007 | 11/20/2007 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 11/19/2007 at 5:30:11 PM. Contact: ###-####.
|
Final | 11/16/2007 | 11/16/2007 | 11/16/2007 | P | PART |
Jim Johnson
|
|
|
alan Phone #: ###-#### need to have soap dispencer installed above mop sink provide signage for hidden backfloe devices in cabnit,s move rp out from behind ice machine for access t
|
Plumbing Rough-in | 10/11/2007 | 10/12/2007 | 10/12/2007 | A | PASS |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 10/11/2007 at 7:34:42 PM. Contact: ###-####.-rough-in & roof drains pass.
|
Groundwork | 9/6/2007 | 9/7/2007 | 9/7/2007 | A | PART |
Eric Strole
|
|
|
allan ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie- sewer & grease line pass- still need water line into building-looked at storm drain on west side of building up to tee. test was good. contractor needs to pull permit for storm drains & related site work.
|
Other | 9/4/2007 | 9/4/2007 | 9/4/2007 | P | PART |
Jim Johnson
|
|
|
alan - conference Phone #: ###-#### conf. with alan on combination waste and vent system for bar area
|