Final | 2/10/2009 | 2/11/2009 | 2/11/2009 | A | PASS |
Daryl Spivey
|
|
|
Brent Proper is the field contact. Needs a final inspection. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|
Final | 2/6/2009 | 2/9/2009 | 2/9/2009 | A | FAIL |
Daryl Spivey
|
|
|
Brent Proper is contact and backflow testing is complete Phone #: ###-#### Internet Inspection Request from: Jeff Stone Main service dcva not installed per manufacturers listing, d/w not set in unit 103...ds
|
Final | 2/5/2009 | 2/6/2009 | 2/6/2009 | P | PART |
Daryl Spivey
|
|
|
Brent Proper is the field conatact. He needs a final inspection on all the public areas. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet need backflow valves tested and certified and d/w set in 103..............ds
|
Final | 1/23/2009 | 1/26/2009 | 1/26/2009 | P | CANC |
Daryl Spivey
|
|
|
Brent P is the field contact. Needs a final on Level 6. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet need to pull another permit for 40 units and tie it to bld06-01451..............and change value on this permit to reflect actual value............ds
|
Plumbing Rough-in | 12/30/2008 | 12/30/2008 | 12/30/2008 | P | PASS |
Daryl Spivey
|
|
|
Brent Proper is the field contact. Needs a rough in inspection on the 7th floor. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet Rough in for building should be complete..............ds
|
Water and/or Sewer | 12/29/2008 | 12/29/2008 | 12/29/2008 | P | CANC |
Daryl Spivey
|
|
|
Brent Proper is the field contact. Needs a domestic water inspection on the 7th floor. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|
Plumbing Rough-in | 12/29/2008 | 12/29/2008 | 12/29/2008 | P | PART |
Daryl Spivey
|
|
|
Brent Proper is the field contact. Needs a domestic water inspection on the 7th floor. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet 7th floor corridor water and rooms 201 and 202 water tested.............ds
|
Water and/or Sewer | 11/20/2008 | 11/20/2008 | 11/20/2008 | P | CANC |
Daryl Spivey
|
|
|
Brent Proper is the field contact. He needs water mains for L3 thru L6 inspected. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|
Plumbing Rough-in | 11/20/2008 | 11/20/2008 | 11/20/2008 | P | PART |
Daryl Spivey
|
|
|
Brent Proper is the field contact. He needs water mains for L3 thru L6 inspected. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet 3 thru 6 main water lines in halls tested......ds
|
Plumbing Rough-in | 10/23/2008 | 10/24/2008 | 10/27/2008 | P | PART |
Daryl Spivey
|
|
|
Jeff Rice is the field contact. He needs a waste connections on showers and tubs inspected on level 7 & 6. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet Inspection done friday the 24th.......air card quit and didn't take inspection..........ds
|
Plumbing Rough-in | 10/20/2008 | 10/21/2008 | 10/21/2008 | A | PART |
Daryl Spivey
|
|
|
Jeff Rice is the field contact. Needs a Waste/Vent inspection on the 7th floor. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet 7th floor waste and vent tested ok........ds
|
Plumbing Rough-in | 10/16/2008 | 10/17/2008 | 10/17/2008 | A | PART |
Daryl Spivey
|
|
|
Brent Proper is the field contact. Needs inspection on Level 7. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet waste and vent on half of 7........ds
|
Water and/or Sewer | 10/15/2008 | 10/15/2008 | 10/15/2008 | P | PART |
Daryl Spivey
|
|
|
Brent Proper is the field contact. He needs an inspection on waste on Level 6. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet 6th floor R/I completed................ds
|
Plumbing Rough-in | 10/9/2008 | 10/10/2008 | 10/10/2008 | P | PART |
Daryl Spivey
|
|
|
Brent Proper is the field contact. Needs rough in inspection for level 6. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet 6th floor water and partial W/V ok..........ds
|
Water and/or Sewer | 9/29/2008 | 9/30/2008 | 9/30/2008 | P | PART |
Daryl Spivey
|
|
|
Brent Proper is the field contact. He needs a Water, waste & vent inspection on Level 1. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|
Water and/or Sewer | 9/26/2008 | 9/29/2008 | 9/29/2008 | A | PART |
Daryl Spivey
|
|
|
Brent Proper is the field contact. Needs a water inspection on level 5 Phone #: ###-#### Internet Inspection Request from: Heidi Mallet water on 5th floor ok.....ds
|
Water and/or Sewer | 9/10/2008 | 9/11/2008 | 9/11/2008 | A | PART |
Daryl Spivey
|
|
|
Brent Proper is the field contact. He needs a DWV inspection on the other half of Level 5. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet 5th floor waste and vent passed......ds
|
Water and/or Sewer | 9/9/2008 | 9/10/2008 | 9/10/2008 | A | PART |
Daryl Spivey
|
|
|
Brent Proper is the field contact. He needs a DWV for 1/2 of Level 5. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet 5th floor west side tested ok..........ds
|
Water and/or Sewer | 9/4/2008 | 9/5/2008 | 9/5/2008 | A | NR |
Daryl Spivey
|
|
|
repipe islands in 3 rooms
|
Plumbing Rough-in | 9/3/2008 | 9/4/2008 | 9/4/2008 | P | FAIL |
Daryl Spivey
|
|
|
Brent Proper is the field contact. He needs the 2nd half of the DWV inspection done on level 4. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet need to repipe islands in 3 kitchens..ds
|
Water and/or Sewer | 9/3/2008 | 9/3/2008 | 9/3/2008 | P | CANC |
Daryl Spivey
|
|
|
Brent Proper is the field contact. Needs a water and waste inspection on level 4. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|
Plumbing Rough-in | 9/3/2008 | 9/3/2008 | 9/3/2008 | P | PART |
Daryl Spivey
|
|
|
Brent Proper is the field contact. Needs a water and waste inspection on level 4. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet part of 4th floor tested.........need to chnage out plumbers tape and install acceptable hangers on cast iron piping.........ds
|
Water and/or Sewer | 8/12/2008 | 8/13/2008 | 8/13/2008 | A | PART |
Daryl Spivey
|
|
|
Brent Proper is the field contact. He needs a DWV and water inspection for level 3. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet 3rd floor W/V and water ok..........roof drains tested to 5th.......ds
|
Plumbing Rough-in | 8/6/2008 | 8/8/2008 | 8/8/2008 | P | PART |
Daryl Spivey
|
|
|
Partial Plumbing inspection requested. Field contact is Brent Proper. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet water for 3rd floor ok...........ds
|
Plumbing Rough-in | 7/30/2008 | 7/31/2008 | 7/31/2008 | A | NR |
Daryl Spivey
|
|
|
Brent Proper is the field contact. Partial Rough In for Level 3 & 4 Phone #: ###-#### Internet Inspection Request from: Heidi Mallet waste and vent only and had some problems with leaks and test holding......ds
|
PLM-Aging Inspection | 7/21/2008 | 7/21/2008 | 7/21/2008 | | NR |
Daryl Spivey
|
|
|
wip
|
Water and/or Sewer | 5/20/2008 | 5/21/2008 | 5/21/2008 | P | PART |
Daryl Spivey
|
|
|
Brent Proper is the field contact. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet as marked on prints for W/V piping.....ds
|
Other | 5/9/2008 | 5/9/2008 | 5/9/2008 | A | PASS |
Daryl Spivey
|
|
|
conference
|
PLM-Aging Inspection | 4/3/2008 | 4/3/2008 | 4/3/2008 | | NR |
Daryl Spivey
|
|
|
wip
|
PLM-Aging Inspection | 1/30/2008 | 1/30/2008 | 1/30/2008 | | NR |
Daryl Spivey
|
|
|
wip
|
Water and/or Sewer | 11/21/2007 | 11/26/2007 | 11/28/2007 | A | PASS |
Daryl Spivey
|
|
|
Brent Proper is the field contact. Inspection for the water main going into the building. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet from water main to inside of bld tested ok....ds
|
Groundwork | 9/21/2007 | 9/21/2007 | 9/21/2007 | P | PART |
Daryl Spivey
|
|
|
Brent Proper is the field contact. Inspection for ejector tank piping. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|
Groundwork | 9/14/2007 | 9/17/2007 | 9/17/2007 | P | PART |
Daryl Spivey
|
|
|
Brent Proper is the field contact. Partial ground work inspection. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet G/W tested is passed ok...ds
|
Groundwork | 9/7/2007 | 9/10/2007 | 9/10/2007 | P | PART |
Daryl Spivey
|
|
|
Brent Proper is the field contact. Partial Ground inpection. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet sand and grease interceptor piping.ok....need to test tank....ds
|