Sprinkler (Final) | 9/14/2007 | 9/17/2007 | 9/17/2007 | A | PASS |
Eric Strole
|
|
|
george Phone #: ###-####
|
Sprinkler (Final) | 9/13/2007 | 9/13/2007 | 9/13/2007 | P | PART |
Jim Johnson
|
|
|
george Phone #: ###-#### 1. need to raise PVB 12 inches above highest floodable sprinkler head. 2. need to have PVB tested and certified. note tie in ok ok to cover. contractor to recall when ready left correction notice on site called contractor and left message
|