Final | 12/31/2007 | 1/2/2008 | 1/2/2008 | A | PASS |
Jim Johnson
|
|
|
mark - as soon as possible Phone #: ###-####
|
Plumbing Rough-in | 11/19/2007 | 11/19/2007 | 11/19/2007 | P | PASS |
Jim Johnson
|
|
|
dean Phone #: ###-####
|
Plumbing Rough-in | 11/15/2007 | 11/15/2007 | 11/15/2007 | P | PART |
Jim Johnson
|
|
|
chewey Phone #: ###-#### need to increase 1/2 inch hot water line to 3/4 up to new tub and shower valves note test on DWV test ok
|
Plumbing Rough-in | 9/27/2007 | 9/28/2007 | 9/28/2007 | A | FAIL |
Jim Johnson
|
|
|
mark Phone #: ###-#### test failed on dwv note home owner has done ground work with out being inspected will need to remove concrete for inspection
|