Final | 11/16/2007 | 11/19/2007 | 11/19/2007 | A | PASS |
Jim Johnson
|
|
|
Additional RPs installed per inspectors request & will be tested 11/16/2007 in the afternoon. Phone #: ###-#### Internet Inspection Request from: Erin Whiting
|
Final | 11/13/2007 | 11/14/2007 | 11/15/2007 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### Internet Inspection Request from: Erin Whiting-did walk thru with plumber on corrections to be made.
|
Plumbing Rough-in | 10/15/2007 | 10/15/2007 | 10/15/2007 | P | PASS |
Jim Johnson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Erin Whiting
|
Plumbing Rough-in | 10/11/2007 | 10/12/2007 | 10/12/2007 | A | PART |
Jim Johnson
|
|
|
Early am if possible, please. Thank you. Phone #: ###-#### Internet Inspection Request from: Erin Whiting need to support all pex piping as per upc 2003 table 3-2 need to protect all pex piping passing through metal stud,s
|
Plumbing Rough-in | 10/9/2007 | 10/10/2007 | 10/10/2007 | P | NR |
Gerry Varner
|
|
|
###-####
|
Final | 9/28/2007 | 9/28/2007 | 9/28/2007 | P | PASS |
Jim Johnson
|
|
|
Please wait til after 1:30 pm for inspection. Thanks Phone #: ###-#### Internet Inspection Request from: Erin Whiting
|
Groundwork | 9/27/2007 | 9/27/2007 | 9/27/2007 | A | FAIL |
Jim Johnson
|
|
|
need to plumb per approved plan,s and provide floor drain in kitchen area as noted on plumbing review notes
|
Water and/or Sewer | 9/26/2007 | 9/27/2007 | 9/27/2007 | A | CANC |
Jim Johnson
|
|
|
The drain lines are holding. As per the GC we were able to run the floor sinks in 2" except for the 3 comp sink and it is 3".
Erin Phone #: ###-#### Internet Inspection Request from: Erin Whiting
|
Groundwork | 9/25/2007 | 9/25/2007 | 9/25/2007 | P | FAIL |
Jim Johnson
|
|
|
back door should be open; otherwise door lock code is 3027 Phone #: ###-#### Internet Inspection Request from: Erin Whiting see correction notice posted on site
|
Groundwork | 9/24/2007 | 9/25/2007 | 9/25/2007 | A | FAIL |
Jim Johnson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Erin Whiting test failed on grease system also need approved set of plan,s on site called contractor will recall when ready
|