Final | 1/4/2008 | 1/7/2008 | 1/7/2008 | A | PASS |
Eric Strole
|
|
|
Call Roger ###-#### to schedule final Phone #: ###-#### Internet Inspection Request from: Allison Briggs
|
Plumbing Rough-in | 10/18/2007 | 10/19/2007 | 10/19/2007 | A | PASS |
Eric Strole
|
|
|
CALL ROGER TO SCHEDULE ROUGH IN ###-#### Phone #: ###-#### Internet Inspection Request from: Allison Briggs
|
Plumbing Rough-in | 10/17/2007 | 10/18/2007 | 10/18/2007 | A | FAIL |
Eric Strole
|
|
|
CALL ROGER TO SCHEDULE ###-#### ROUGH INSPECTION Phone #: ###-#### Internet Inspection Request from: Allison Briggs-fik backgrade on 2nd flr toilet & kitchen sink drain in crawl & kitchen traparm, fix backgrade on 1st flr tub vent, missing nailplates, retest dwv.
|