Final | 1/10/2008 | 1/10/2008 | 1/10/2008 | P | PASS |
Jim Johnson
|
|
|
Final inspection job is open any concerns or questions please call kirk Johns Phone #: ###-#### Internet Inspection Request from: Kirk Johns
|
Water and/or Sewer | 12/20/2007 | 12/21/2007 | 12/21/2007 | A | PART |
Jim Johnson
|
|
|
Call if you have any questions. Phone #: ###-#### Internet Inspection Request from: Kirk Johns this inspection is for a final dog wash tub need additional backflow installed ned strainer for floor sink called contractor will recall when ready
|
Final | 10/24/2007 | 10/24/2007 | 10/24/2007 | P | PART |
Jim Johnson
|
|
|
need to have dog bath installed may need additional backflow protection oked temp.
|
Final | 10/22/2007 | 10/23/2007 | 10/23/2007 | A | NR |
Jim Johnson
|
|
|
Phone #: ###-#### Internet Inspection Request from: Kirk Johns not ready
|
Water and/or Sewer | 10/5/2007 | 10/5/2007 | 10/5/2007 | P | PASS |
Jim Johnson
|
|
|
rough-in plumbing of water and sewer lines Phone #: ###-#### Internet Inspection Request from: Kirk Johns this inspection is for the rough-in
|
Groundwork | 10/4/2007 | 10/4/2007 | 10/4/2007 | P | PASS |
Jim Johnson
|
|
|
door is open call with questions Phone #: ###-#### Internet Inspection Request from: Kirk Johns
|