Final | 1/30/2008 | 1/30/2008 | 1/30/2008 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/30/2008 at 7:58:51 AM. Contact: ###-####.
|
Plumbing Rough-in | 10/11/2007 | 10/12/2007 | 10/12/2007 | P | PASS |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 10/11/2007 at 4:44:29 PM. Contact: ###-####.
|
Plumbing Rough-in | 10/8/2007 | 10/9/2007 | 10/9/2007 | P | FAIL |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 10/8/2007 at 5:33:41 PM. Contact: . install tub and tub valves. do the same at 7474 Baron across the street..
|
Plumbing Rough-in | 10/5/2007 | 10/5/2007 | 10/5/2007 | P | NR |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 10/5/2007 at 8:01:00 AM. Contact: ###-####.
|