Final | 2/2/2009 | 2/3/2009 | 2/3/2009 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 2/2/2009 at 1:32:35 PM. Contact: ###-####. final ok 1/2 bath deleted
|
Plumbing Rough-in | 1/9/2008 | 1/11/2008 | 1/11/2008 | P | PASS |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 1/9/2008 at 7:50:44 AM. Contact: ###-####.
|
Plumbing Rough-in | 1/4/2008 | 1/8/2008 | 1/8/2008 | P | FAIL |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 1/4/2008 at 2:35:34 PM. Contact: ###-####. HOME OWNER TO MAKE SOME W&V CHANGES.I ALLOWED HIM TO LEAVE THESAN TEE FOR HIS TUB VENT. AND THAT HE CAN TEST THE TUB TRAP PIPING AFTER THE MAIN W&V TEST THRU THE FILLING AND DUMPING OF THE TUB.
|