Final | 7/11/2008 | 7/14/2008 | 7/16/2008 | A | PASS |
Daryl Spivey
|
|
|
|
Final | 7/11/2008 | 7/11/2008 | 7/11/2008 | P | NR |
Daryl Spivey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Michelle Gorham
|
Plumbing Rough-in | 5/22/2008 | 5/22/2008 | 5/22/2008 | P | PASS |
Daryl Spivey
|
|
|
inspect water and waste lines on the first floor. Phone #: ###-#### Internet Inspection Request from: Michelle Gorham roof drains also tested..........ds
|
Plumbing Rough-in | 5/16/2008 | 5/16/2008 | 5/16/2008 | P | PART |
Daryl Spivey
|
|
|
darren Phone #: ###-#### water tested ok..........ds
|
Roof Drains | 5/16/2008 | 5/16/2008 | 5/16/2008 | P | PART |
Daryl Spivey
|
|
|
all ok except deck drains.......ds
|
Plumbing Rough-in | 5/8/2008 | 5/8/2008 | 5/8/2008 | P | PART |
Daryl Spivey
|
|
|
darin Phone #: ###-#### waste, vent and water ok for restrm groups...not ready with service sink and mech room ares....ds
|
PLM-Aging Inspection | 4/21/2008 | 4/21/2008 | 4/21/2008 | | NR |
Daryl Spivey
|
|
|
wip
|
PLM-Aging Inspection | 2/20/2008 | 2/20/2008 | 2/20/2008 | | NR |
Daryl Spivey
|
|
|
wip
|
PLM-Aging Inspection | 12/18/2007 | 12/18/2007 | 12/18/2007 | | NR |
Daryl Spivey
|
|
|
wip
|
Groundwork | 10/15/2007 | 10/15/2007 | 10/15/2007 | P | PASS |
Daryl Spivey
|
|
|
gorham plm. Phone #: ###-####
|